Southern California Edison Company; Notice of Application Accepted for Filing With the Commission, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations and Preliminary Fishway Prescriptions
Federal Register Notices
조회 0
Public Domain
이 매체는 공공·자유 라이선스로 본문을 직접 표시합니다.This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Southern California Edison Company; Notice of Application Accepted for Filing With the Commission, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations and Preliminary Fishway Prescriptions
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
There is no table of contents available for this document.
Related Documents
Enhanced Content - Related Documents
FederalRegister.gov uses the agency dockets published with the document to display related documents.
Public Comments
Enhanced Content - Public Comments
This feature is not available for this document.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
Additional information is not currently available for this document.
This PDF is FR Doc. 2026-10988 as it appeared on Public Inspection on
06/01/2026 at 8:45 am.
It was viewed
2
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2026-10988 (91 FR 32968)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a.
Type of Application:
New major license.
b.
Project No.:
1388-082.
c.
Date filed:
January 29, 2025.
d.
Applicant:
Southern California Edison Company.
e.
Name of Project:
Lee Vining Hydroelectric Project.
f.
Location:
The existing project is located on both Lee Vining and Glacier Creeks in Inyo County, California, near the town of Lee Vining. The project affects 536 acres of federal land managed by the U.S. Forest Service.
h.
Applicant Contact:
Wayne Allen, Principal Manager, Southern California Edison Company, 2244 Walnut Grove Avenue, Rosemead, CA 91770; Telephone (626) 302-9741 or email
wayneallen@sce.com.
j.
Deadline for filing motions to intervene and protests, comments, recommendations, terms and conditions, and prescriptions:
on or before 5:00 p.m. Eastern Time on July 27, 2026; reply comments are due on or before 5:00 p.m. Eastern Time on September 10, 2026.
The Commission strongly encourages electronic filing. Please file file motions to intervene and protests, comments, recommendations, terms and conditions, and prescriptions using the Commission's eFiling system at
https://ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments up to 10,000 characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx.
For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov,
(866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy via U.S. Postal Service to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P-1388-082.
The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted and is ready for environmental analysis.
l. The existing Lee Vining Hydroelectric Project consists of four dams and three reservoirs including: (1) the 600-foot-long, 45-foot-high redwood-faced rockfill Saddlebag Dam with: (a) a 54-foot-wide, 4.5-foot-deep rectangular notch spillway that discharges directly into Lee Vining Creek below the dam, (b) a 297-acre Saddlebag Lake impoundment with 9,495 acre-feet net storage capacity at 10,089.40 feet above mean sea level elevation (msl), (c) a 220-foot-long, 30-inch-diameter riveted steel pipeline to extend the outlet downstream of the dam, and (d) a low-level outlet works with maximum discharge capacity of about 150 cubic feet per second (cfs) that discharge directly into Lee Vining Creek and consists of: (i) a fully submerged, ungated, concrete intake box at 10,048.8 feet msl located at upstream toe of the dam that admits water to (ii) a 30-inch-diameter concrete-encased steel pipe that passes under the dam near the left abutment that is controlled at the downstream toe by (iii) a manually operated 30-inch rising stem gate valve, and (iv) a concrete valve house located at the south of Saddlebag Dam; (2) the 270-foot-long, 27-foot-high redwood-faced rockfill Tioga Dam with: (e) 57-feet-wide, 4-feet-deep spillway with a crest elevation of 9,650.28 feet msl, (f) the low-level outlet works consisting of a 24-inch-diameter concrete-encased riveted steel pipe that passes through the base of the main Tioga Dam with an upstream invert elevation of 9,626.72 feet msl, draining into Lee Vining Creek which is manually controlled by (g) a 24-inch gate valve located in (h) a concrete valve house at the downstream toe of the Tioga Dam; and (3) the 50-foot-long, 19-foot-high, concrete-arch Tioga Auxiliary Dam located on Tioga Lake in the headwaters of Glacier Creek, that together with the Tioga Dam impound the 73-acre Tioga Lake with 1,254 acre-feet net storage capacity at 9,650.28 feet msl, and (j) the 19.5-foot-long right auxiliary spillway bay, and the 21.5-foot-long left auxiliary spillway bay at 9,651.28 feet msl crest elevation; and (4) the 437-foot-long, 18.5-foot-high rockfill Rhinedollar Dam that (k) impounds the 61-acre Ellery Lake with 493 acre-feet net storage capacity at 9,492.53 feet above msl, (l) three spillway bays, each 12-foot-wide and 6.5-foot-deep, located at Rhinedollar Dam at an elevation of 9,492.53 feet msl, (m) a reinforced concrete intake structure at 9,480 feet elevation msl, (n) a 6,271-foot-long below ground flowline with a maximum flow of 110 cfs that convey flows from Ellery Lake at the Rhinedollar Dam to Poole Powerhouse and consists of: (v) a 2,530-foot-long, 48-inch-diameter double riveted steel pipeline, and (vi) a 3,741-foot-long steel penstock that tapers from 44- to 28-inches in diameter; (o) the outlet works
( printed page 32969)
consists of a 48-inch concrete-encased steel pipe conduit with a butterfly valve at the downstream end; (p) the 68-foot-long, 38-foot-wide, 43-foot-high reinforced concrete Poole Powerhouse and located on Lee Vining Creek east downstream of Ellery Lake which contains one generating unit with a nameplate capacity of 11.25 megawatts (MWs); (q) a switchyard located immediately north of the powerhouse that contains the main power transformers, (r) approximately 50 feet of primary transmission line between the switchyard and Poole Powerhouse, (s) seven project-associated stream gages immediately downstream of Saddlebag and Tioga Dams, in stream; and (t) appurtenant facilities.
Southern California Edison Company is not proposing any changes to project facilities or operation.
m. A copy of the application may be viewed on the Commission's website at
http://www.ferc.gov
using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport. A copy is also available for inspection and reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “COMMENTS”, “REPLY COMMENTS”, “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at
https://ferconline.ferc.gov/FERCOnline.aspx
to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202)502-6595 or
OPP@ferc.gov.
o. The applicant must file the following on or before 5:00 p.m. Eastern Time on July 27, 2026: (1) a copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification.
p. Final amendments to the application must be filed with the Commission on or before 5:00 p.m. Eastern Time June 29, 2026.
이 뉴스, 독자들은 어떻게 느꼈나요?
첫 반응을 남겨보세요로그인하면 감정 반응에 참여할 수 있어요.
공식 발표 ↔ 진영별 보도
공식 발표 (1건) — 공공 라이선스 원문 직접 열람
진보 성향0
보도 없음
중도 성향0
보도 없음
보수 성향0
보도 없음
관련 뉴스 제보는 로그인 후 가능합니다.
'government' 카테고리 뉴스
Certain TOPCon Solar Cells, Modules, Panels, Components Thereof, and Products Containing Same; Notice of a Commission Determination Not To Review an Initial Determination Granting Tesla, Inc.'s Motion To Intervene
Federal Register Notices
Importer of Controlled Substances Application: Cerilliant Corporation
Federal Register Notices
Bulk Manufacturer of Controlled Substances Application: Veranova, L.P.
Federal Register Notices
Federal Register의 다른 기사
Palisades SMR, LLC; Pioneer Units 1 and 2; Phased Construction Permit Application; Limited Work Authorization; Notice of Intent To Conduct Scoping Process and Prepare an Environmental Impact Statement
Federal Register Notices
30-Day Notice of Request for Renewal With Change of a Previously Approved Collection
Federal Register Notices
Agency Information Collection Activities: Proposed Collection: Comment Request-EmpowHR/Person Model Non-Employee Data Sheet-FNA-775
Federal Register Notices