NuFuels, Inc.; Crownpoint Uranium Recovery Project; Draft Environmental Assessment and Draft Programmatic Agreement
[Federal Register Volume 91, Number 223 (Friday, November 20, 2026)]
[Notices]
[Pages 75356-75359]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-23630]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 040-08968; NRC-2026-1882]
NuFuels, Inc.; Crownpoint Uranium Recovery Project; Draft
Environmental Assessment and Draft Programmatic Agreement
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for
public comment a draft environmental assessment (EA) and finding of no
significant impact (FONSI) and draft programmatic agreement (PA)
regarding the proposed renewal of Source and Byproduct Materials
License Number SUA-1580, which authorizes NuFuels, Inc., to operate the
proposed Crownpoint Uranium Project (CUP) in situ recovery (ISR)
facility. NuFuels requests a renewed license that, if granted, would
authorize it to construct and operate the CUP for 20 years beyond the
date of the renewed license. The CUP operations are proposed on four
project areas in the Church Rock and Crownpoint areas of McKinley
County, New Mexico (Church Rock Section 8, Church Rock Section 17, Unit
1, and Crownpoint).
DATES: Submit comments by December 21, 2026. Comments received after
this date will be considered if it is practical to do so, but the
Commission is able to ensure consideration only for comments received
on or before this date.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal rulemaking website.
Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-1882. Address
questions about Docket IDs in Regulations.gov to Bridget Curran;
telephone: 301-415-1003; email: [email protected]. For technical
questions, contact the individual(s) listed in the For Further
Information Contact section of this document.
Mail comments to: Office of Nuclear Material Safety and
Safeguards, Mail Stop: TWFN-5-A85, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, ATTN: Guidance and Publications Branch.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Christine Pineda, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-6789; email:
[email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2026-1882 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-1882.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.''
For problems with ADAMS, please contact the NRC's Public Document Room
(PDR)
[[Page 75357]]
reference staff at 1-800-397-4209, at 301-415-4737, or by email to
[email protected]. For the convenience of the reader, instructions
about obtaining materials referenced in this document are provided in
the ``Availability of Documents'' section.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. Eastern Time (ET), Monday through Friday, except
Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2026-1882 in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at
https://www.regulations.gov and enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Introduction
The NRC is issuing for public comment a draft EA and draft PA for
the proposed renewal of NuFuels' license SUA-1580. Pursuant to
paragraph 800.2(d)(3) of title 36 of the Code of Federal Regulations
(36 CFR), the NRC is using this draft EA to satisfy the public
involvement requirements of the National Historic Preservation Act of
1966, as amended (NHPA). The draft PA is included in the draft EA as
Appendix A. The NRC staff is pursuing execution of the PA in accordance
with 36 CFR 800.4(b)(2) and 800.14(b) to satisfy its obligations under
Section 106 of the NHPA for NuFuels' license renewal request.
If the license is renewed, NuFuels could, after receiving all
applicable permits and authorizations, construct and operate ISR
facilities on the Church Rock, Crownpoint and Unit 1 project areas in
McKinley County, New Mexico, as described in the draft EA. The project
areas are within the external boundaries of the Navajo Nation, and
several portions of the project areas are Navajo trust lands (lands
held in trust for the Navajo Nation by the U.S. Government). As
required by section 51.21 of title 10 of the Code of Federal
Regulations (10 CFR), the NRC has prepared a draft EA documenting its
preliminary finding. The NRC concluded that the proposed renewal of
NuFuels' license for 20 years would have no significant impacts.
III. Summary of Draft Environmental Assessment
Description of the Proposed Action
The proposed Federal action is approval of NuFuels' application for
license renewal. If the NRC decides to renew the license, NuFuels could
construct and operate ISR facilities, wellfields, and support
operations on the Crownpoint, Unit 1, and Church Rock Sections 8 and 17
areas. Other licensed activities include aquifer restoration and
decommissioning activities. The NRC will renew license SUA-1580 under
10 CFR part 40, ``Domestic Licensing of Source Material,'' if the NRC
concludes that NuFuels has demonstrated it will meet NRC requirements
for construction, operation, aquifer restoration, and decommissioning
at the Crownpoint, Church Rock Section 8 and Section 17, and Unit 1
areas.
The Crownpoint license areas collectively occupy over 2,500 acres,
and the area disturbed over the estimated life of the project is
approximately 478 acres. The ISR project would consist of processing
facilities and sequentially developed wellfields (mine units), a
central processing plant that would produce yellowcake, two satellite
processing (ion exchange) facilities, septic systems, evaporation
ponds, and associated infrastructure and support facilities. Uranium
would be recovered from the Westwater Canyon Member of the Morrison
Formation, which occurs at an average depth of 1,840 feet below the
ground surface. License SUA-1580 requires that the processing plant
flow rate at each area (Church Rock, Unit 1, or Crownpoint) not exceed
4,000 gallons per minute, and that the total yellowcake production not
exceed 3 million pounds annually. NuFuels has not started construction
of the ISR facilities.
Before beginning ISR facility construction, NuFuels must obtain all
necessary permits and approvals from several Federal agencies, the
State of New Mexico, and the Navajo Nation, in addition to any locally-
issued permissions. Sections 1.5 and 1.6 of the draft EA identify and
describe the status of these permits and approvals.
After operations at a wellfield cease, NuFuels would begin aquifer
restoration to return groundwater quality within the production zone of
wellfields to standards consistent with NRC requirements in the license
and at 10 CFR part 40, Appendix A, Criterion 5B(5). After groundwater
restoration, NuFuels would submit a decommissioning plan for NRC
approval and then proceed with reclamation and decommissioning. If
NuFuels expects aquifer restoration or decommissioning operations to
continue beyond the 20-year license renewal period, NuFuels would need
to apply for another renewal.
Subject to NuFuels' responses to the NRC's September 22, 2026,
request for information, the proposed action is in accordance with
NuFuels' application dated August 20, 2026, which includes responses to
the NRC's July 9, 2026, request for additional information.
Purpose and Need for the Proposed Action
The purpose of the proposed license renewal is to enable NuFuels to
begin and continue ISR operations for an additional 20 years. In
regulating uranium milling and the ISR process, the NRC is meeting its
obligations under the Atomic Energy Act of 1954, as amended, (AEA) to
allow and ensure the safe possession and use of radioactive materials.
This definition of ``purpose and need'' reflects the Commission's
recognition that if the applicant meets NRC regulatory requirements and
the staff is able to make the safety findings required by the AEA, as
amended, the NRC has no role in a company's decision to construct and
operate an ISR facility at a particular location.
Environmental Impacts of the Proposed Action
The NRC staff has assessed the potential environmental impacts of
the proposed action. The NRC staff relied, as appropriate, on the NRC's
1997 ``Final Environmental Impact Statement to Construct and Operate
the Crownpoint Uranium Solution Mining Project, Crownpoint, New
Mexico,'' as well as the NRC's 2009 generic environmental impact
statement,
[[Page 75358]]
NUREG-1910, ``Generic Environmental Impact Statement for Uranium
Milling Facilities--Final Report,'' or ISR GEIS.
No significant changes in the proposed operations are planned or
expected, as compared with the proposed CUP as currently licensed. The
proposed land use on Section 8 (owned by NuFuels) increased from 160
acres as previously proposed to a current proposal of 174.5 acres.
NuFuels is currently engaged in remediating portions of the Church Rock
Section 17 area under Environmental Protection Agency and Navajo Nation
Environmental Protection Agency authority. These areas were
contaminated during past uranium mining operations at the Old Church
Rock Mine site.
The environmental impacts of the proposed license renewal are
assessed in Chapter 3 of the draft EA. The NRC staff assessed the
potential impacts on land use; visual and scenic resources; noise; air
quality; geology and soils; surface water resources; groundwater
resources; ecological resources; historic and cultural resources;
socioeconomics; transportation; public and occupational health and
safety; and waste management. The NRC staff determined that the
environmental impacts of the proposed action would not be significant
for each potentially affected environmental resource.
In accordance with the NHPA, the NRC staff evaluated potential
impacts to historic and cultural resources at the CUP. The NRC staff is
proceeding with consultation under Section 106 of the NHPA and has
developed a draft PA for comment, as described in section IV of this
notice.
In accordance with the Endangered Species Act, the NRC staff
evaluated potential impacts to Federally protected ecological resources
that may result from the proposed action. As discussed in section 1.6.5
of the draft EA, the U.S. Fish and Wildlife Service concurred with the
NRC staff's determinations of ``may affect but is not likely to
adversely affect'' the southwestern willow flycatcher and the yellow-
billed cuckoo.
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed license renewal for the CUP, the
NRC considered the no-action alternative. Under the no-action
alternative, the NRC would not renew license SUA-1580 and NuFuels would
not be able to pursue construction and operation of ISR facilities at
any of the project areas. Consequently, there would be no ISR-related
environmental impacts on land use, transportation, geology and soils,
air quality, water resources, ecological resources, noise, historic and
cultural resources, visual and scenic resources, waste management,
socioeconomics, and public and occupational health and safety. Drill
holes associated with preconstruction activities would be properly
plugged and abandoned, and the wells would be decommissioned.
Additionally, the uranium minerals present in the Church Rock, Unit
1, and Crownpoint areas would not be made available to support the U.S.
nuclear fuel supply chain with domestically produced uranium.
Agencies and Persons Consulted
The NRC provided a preliminary draft of the EA to several
cooperating and commenting Federal agencies (Environmental Protection
Agency, Bureau of Indian Affairs, Bureau of Land Management, Army Corps
of Engineers, and Bureau of Reclamation), the State of New Mexico, and
the Navajo Nation for review and comment. The NRC has published this
draft EA to receive additional comments from these agencies and from
members of the public, other American Indian Tribes, local governments,
and organizations. Section 1.6 of the draft EA describes the NRC's
consultation and coordination efforts during the development of this
draft EA and the draft PA.
IV. Draft Programmatic Agreement
Appendix A of the draft EA contains the draft ``Programmatic
Agreement Among U.S. Nuclear Regulatory Commission, Navajo Nation,
Navajo Nation Tribal Historic Preservation Officer, U.S. Bureau of Land
Management, and NuFuels, Inc., Regarding the Crownpoint Uranium Project
Located in McKinley County, New Mexico.''
The NRC staff has determined a phased process for compliance with
Section 106 of the NHPA is appropriate for this undertaking, as
specifically permitted under 36 CFR 800.4(b)(2), Section 106
implementing regulations. Pursuant to 36 CFR 800.8, the NRC is
coordinating its Section 106 process with its review under the National
Environmental Policy Act of 1969, as amended. Section 1.6.4 of the
draft EA describes the NRC staff's Section 106 consultation process and
development of the draft PA. For additional information, Section 3.7 of
the draft EA describes the cultural and historic resources identified
in the project areas, the cultural context of the project areas, and
the potential impacts of the ISR project on cultural and historic
resources.
V. Preliminary Finding of No Significant Impact
In accordance with the requirements in 10 CFR part 51, the NRC
staff has preliminarily concluded that the proposed action would not
significantly affect the quality of the human environment. Therefore,
the NRC staff has determined, pursuant to 10 CFR 51.31,
``Determinations based on environmental assessment,'' that preparation
of an environmental impact statement is not required for the proposed
action, and pursuant to 10 CFR 51.32, ``Finding of no significant
impact,'' a FONSI is appropriate. Consistent with 10 CFR 51.32(a)(4),
this preliminary FONSI incorporates by reference the draft EA described
in this notice.
VI. Availability of Documents
The documents identified in the following table are available to
interested persons through one or more of the following methods, as
indicated.
------------------------------------------------------------------------
Document description ADAMS accession Nos.
------------------------------------------------------------------------
Draft Environmental Assessment for the ML26316A058.
Proposed License Renewal for the
Crownpoint Uranium Recovery Project in
McKinley County, New Mexico, dated
November 12, 2026.
NuFuels' License SUA-1580, Amendment 5, ML18155A199.
dated July 16, 2018.
NRC Staff Request for Additional ML26260A323.
Information, dated September 22, 2026.
NuFuels' Updated Consolidated Operations ML26233A167 (package).
Plan, Environmental Report, and Responses
to NRC RAIs, dated August 20, 2026.
Final Environmental Impact Statement to ML082170248.
Construct and Operate the Crownpoint
Uranium Solution Mining Project,
Crownpoint, New Mexico, NUREG-1508, dated
February 28, 1997.
Generic Environmental Impact Statement for ML091480244 and
In-Situ Leach Uranium Milling Facilities-- ML091480188.
Final Report, NUREG-1910, dated May 28,
2009.
------------------------------------------------------------------------
[[Page 75359]]
Authority: 42 U.S.C. 2011 et seq.
Dated: November 17, 2026.
For the Nuclear Regulatory Commission.
Robert Sun,
Chief, Environmental Review Materials Branch, Division of Storage of
Fuel, Transportation, and Environmental, Office of Nuclear Material
Safety, and Safeguards.
[FR Doc. 2026-23630 Filed 11-19-26; 8:45 am]
BILLING CODE 7590-01-P