Interim Staff Guidance: NRC Application Pathway for Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War
[Federal Register Volume 91, Number 224 (Monday, November 23, 2026)]
[Notices]
[Pages 75567-75569]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-23753]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2026-0760]
Interim Staff Guidance: NRC Application Pathway for Reactor
Designs Previously Authorized by U.S. Department of Energy or
Department of War
AGENCY: Nuclear Regulatory Commission.
ACTION: Final guidance; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing
Interim Staff Guidance (ISG), DANU-ISG-2026-02, ``NRC Application
Pathway for Reactor Designs Previously Authorized by U.S. Department of
Energy or Department of War.'' The purpose of this guidance is to
provide a roadmap to NRC requirements, and associated implementing
guidance, in select foundational areas to support streamlined NRC
reviews of certain applications that propose to address the
accomplishment of safety functions by leveraging pertinent information
from prior U.S. Department of Energy (DOE) or Department of War (DOW)
authorizations of demonstration reactors.
DATES: This guidance is effective on November 23, 2026.
ADDRESSES: Please refer to Docket ID NRC-2026-0760 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-0760. Address
questions about Docket IDs in Regulations.gov to Bridget Curran;
telephone: 301-415-1003; email: [email protected]. For technical
questions, contact the individual(s) listed in the ``For Further
Information Contact'' section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.''
For problems with ADAMS, please contact the NRC's Public Document Room
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email
to [email protected]. The ISG, titled ``NRC Application Pathway for
Reactor Designs Previously Authorized by U.S. Department of Energy or
Department of War,'' is available in ADAMS under Accession No.
ML26239A071.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Jackie Harvey, Office of Advanced
[[Page 75568]]
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-7534; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Background
On April 17, 2026, the NRC issued a Federal Register notice (91 FR
20717) soliciting public comment on its draft ISG, ``NRC Application
Pathway for Reactor Designs Previously Authorized by U.S. Department of
Energy or Department of War.'' The NRC received 56 unique comment
submissions from individuals and organizations. The NRC considered
these comments in developing the final version of the ISG and has
prepared a summary and analysis of public comments (``Comment Response
Document for the draft ISG: NRC Application Pathway for Reactor Designs
Previously Authorized by U.S. Department of Energy or Department of
War'') received on the draft ISG (ADAMS Accession No. ML26239A068).
II. Discussion
On May 23, 2025, President Donald J. Trump signed Executive Order
(E.O.) 14300, ``Ordering the Reform of the Nuclear Regulatory
Commission.'' Section 5, ``Reforming and Modernizing the NRC's
Regulations,'' requires the NRC to undertake a review and wholesale
revision of its regulations and guidance documents as guided by the
policies set forth in section 2 of E.O. 14300. Section 5(d) of the E.O.
requires the NRC to establish an expedited pathway to approve reactor
designs that the U.S. DOE or DOW have tested and that have demonstrated
the ability to function safely.\1\ The NRC is addressing section 5(d)
of this E.O. primarily through two activities, as summarized later in
this document. This Federal Register notice includes one such activity.
Specifically, the NRC is issuing an ISG that would facilitate the
development and review of applications for an NRC approval that seeks
to leverage a prior DOE or DOW authorization.
---------------------------------------------------------------------------
\1\ Consistent with E.O. 14347, ``Restoring the United States
Department of War,'' this Federal Register notice refers to the
``Department of War'' and ``Department of Defense'' interchangeably.
---------------------------------------------------------------------------
The purpose of this ISG is to provide a roadmap to NRC requirements
and associated guidance for areas in select, foundational areas of
reactor facility safety and the protection of public health and safety.
Due to the broad range of technology types and deployment options that
may be authorized by DOE and DOW, this roadmap compiles NRC application
requirements to aid developers while they are establishing their DOE or
DOW authorization request and related NRC commercial licensing
strategy. Importantly, this roadmap is not intended to be a
comprehensive recitation of all applicable NRC requirements for a given
requested approval. Nevertheless, this ISG is intended to assist
prospective NRC applicants in determining how they can best maximize
the overlap between what would be required to satisfy both sets of
requirements (i.e., NRC requirements and DOE or DOW requirements, as
applicable). In so doing, the NRC may be able to leverage more
information that has been previously reviewed and accepted by DOE or
DOW when the NRC staff performs its subsequent review of a commercial
application. In addition, this ISG is also intended to support a
streamlined NRC review of applications in areas that include pertinent
information regarding the accomplishment of safety functions related to
DOE- or DOW-authorized reactor facilities, in which the NRC staff would
appropriately adjust the focus and depth of that review when
implementing the whole-of-government ``leveraging'' concept introduced
by E.O. 14300.
While not the subject of this Federal Register notice, the other
primary activity addressing section 5(d) of E.O. 14300 was the
initiation of a separate rulemaking that amends NRC requirements in
part 50 of title 10 of the Code of Federal Regulations (10 CFR),
``Domestic Licensing of Production and Utilization Facilities,'' and
part 53, ``Risk-Informed, Technology-Inclusive Regulatory Framework for
Commercial Nuclear Plants,'' to explicitly establish a pathway for
streamlined reviews for licensing commercial reactor designs that have
previously received DOE or DOW authorization and that have been tested
and have demonstrated the ability to function safely. No change was
needed for 10 CFR part 52, ``Licenses, Certifications, and Approvals
for Nuclear Power Plants,'' as it references the part 50 requirement
that is being modified in the rulemaking. The final rule for that
activity, ``NRC Reviews of Reactor Designs Previously Authorized by
U.S. Department of Energy or Department of War,'' is being published
separately from this action. The information in this ISG supports NRC
reviews of applications under 10 CFR part 50 or part 52 pursuing the
explicit pathway established by the rulemaking.
Other efforts that aid in the implementation of section 5(d) of
E.O. 14300 include the NRC's issuance of an addendum to the previously
existing Memorandum of Understanding (MOU) between the NRC and DOE,
titled ``Coordinating DOE and NRC Technical Expertise and Knowledge on
Advanced Nuclear Reactor and Advanced Reactor Fuel Technologies''
(ADAMS Accession No. ML25303A288). In particular, the addendum
addresses coordination of DOE and NRC technical readiness and sharing
of technical expertise and knowledge on advanced nuclear reactor and
advanced reactor fuel technologies. The addendum also enables the
documented safety analyses for DOE-authorized nuclear facilities that
have been tested and that have demonstrated the ability to function
safely to be leveraged to streamline and expedite future NRC licensing
activities pursuant to E.O. 14300, section 5(d). Future planned
activities may include the development of a crosswalk between the NRC
regulations and guidance summarized in this ISG and associated DOE
authorization process requirements, and consideration and development
of other MOUs, as appropriate.
III. Backfitting, Forward Fitting, and Issue Finality
This ISG provides guidance for the development and NRC staff review
of applications for licenses, permits, certifications, or approvals
under 10 CFR parts 50 and 52 that include consideration of relevant
information gathered from a design that has been previously authorized
by DOE or DOW as a utilization facility and that has been tested and
has demonstrated the ability to function safely. Issuance of this ISG
does not constitute backfitting as defined in 10 CFR 50.109,
``Backfitting,'' and as described in NRC Management Directive (MD) 8.4,
``Management of Backfitting, Forward Fitting, Issue Finality, and
Information Requests''; does not constitute forward fitting as that
term is defined and described in MD 8.4; and does not affect the issue
finality of any approval issued under 10 CFR part 52. The guidance is
for voluntary use by future applicants and is not imposed on any
current licensees or applicants or existing or requested approvals
under 10 CFR parts 50 or 52, and therefore its issuance does not
constitute a backfit, forward fit, or a change affecting issue
finality.
IV. Congressional Review Act
This ISG is a rule as defined in the Congressional Review Act (5
U.S.C. 801-808). However, the Office of Management and Budget has not
found
[[Page 75569]]
it to be a major rule as defined in the Congressional Review Act.
V. Executive Order (E.O.) 12866
The Office of Information and Regulatory Affairs (OIRA) determined
that this final ISG is a significant regulatory action under E.O.
12866. Accordingly, the NRC submitted this final ISG to OIRA for
review.
Authority: 42 U.S.C. 2011 et seq.
Dated: November 18, 2026.
For the Nuclear Regulatory Commission.
Mehdi Reisi Fard,
Director, Division of Advanced Reactor Engineering, Office of Advanced
Reactors.
[FR Doc. 2026-23753 Filed 11-20-26; 8:45 am]