รrsted completes cable works at Taiwan offshore wind farm
The developer said all 42 turbines at the projectโs second phase, the 583-MW Greater Changhua 4 wind farm, are now connected to Taipowerโs grid and generating electricity.
๐ท๐บ ๋ฌ์์ ยท "CABLE" ยท ์ด 3๊ฑด
ํํฐ ๋ณด๊ธฐํ์ฌ ์ง์
50.0
0 = ๋ถ์ ์ฐ์ธ
50 = ์ค๋ฆฝ
100 = ๊ธ์ ์ฐ์ธ
์ต๊ทผ 7์ผ ๊ธฐ์ค 1,355๊ฑด์ ๋ถ์ํ ๊ฒฐ๊ณผ, ๋ด์ค ์ฌ๋ฆฌ์ง์๋ 50.0(๊ท ํ)์ ๋๋ค. ๊ธ์ 0๊ฑด(0.0%)ยท์ค๋ฆฝ 1,355๊ฑด(100.0%)ยท๋ถ์ 0๊ฑด(0.0%)์ด๋ฉฐ, ์ค๋ฆฝ ๋น์ค์ด ๋๋ ทํ๊ฒ ๋์ต๋๋ค. ์ฑํฅ ์ง์๋ ์ข ํฉ 0.0(์ค๋ ๊ท ํ)์ ๋๋ค.
The developer said all 42 turbines at the projectโs second phase, the 583-MW Greater Changhua 4 wind farm, are now connected to Taipowerโs grid and generating electricity.
Iranโs push to tax Strait of Hormuz undersea cables shows how internet routes are becoming a new front in pressure tactics and tech risk Read Full Article at RT.com
Traffic through the Strait of Hormuz slightly increased as Iran offers an insurance scheme and NATO is reportedly considering intervening Read Full Article at RT.com