Displacement stage division and characteristic analysis before failure of Tonglüshan tailings dam based on improved displacement tangent angle method

PLOS ONE
CC BY
이 매체는 공공·자유 라이선스로 본문을 직접 표시합니다.

Figures
Abstract
Against the backdrop of the continuous development of the global mining industry, the number of tailings ponds is steadily increasing. The safety issues of tailings dams have emerged as significant potential hazards that affect the ecological environment, human life and property. Therefore, there is an urgent need for effective monitoring and analysis technologies. This study aims to utilize Interferometric Synthetic Aperture Radar (InSAR) technology to monitor the deformation of the Tonglüshan tailings dam, conduct an in-depth analysis of the causes and processes of its dam failure, and thereby explore practical methods for tailings dam safety monitoring. In the research methodology, the Small Baseline Subset Interferometric Synthetic Aperture Radar (SBAS-InSAR) technology was employed to process 50 Sentinel-1A images. Moreover, by integrating the improved Displacement Tangent Angle Method (IDTAM), an easy approach was established to divide the deformation stages of the tailings dam. The research results are as follows. The deformation of the tailings dam exhibits four distinct stages. Evidently, precipitation plays a crucial role in promoting the dam's deformation. Additionally, significant correlative relationships have been identified among the deformations in different areas. Notably, the deformations in areas M1 and M2 are induced by different factors. Overall, this study has achieved significant findings. Firstly, it has successfully revealed a causal relationship between the dam failure of the Tonglüshan tailings dam and the collapse of the goaf in the northern part. Secondly, the improved Displacement Tangent Angle Method has proven to be a novel and valuable tool for analyzing the inversion results of InSAR technology. It holds great promise in the displacement monitoring and analysis of homogeneous slopes, providing a new perspective and method for similar engineering applications..
Citation: Liang Q, Xiaojing L, Yue Y, Zhiqiang L, Ya L, Liyun Z, et al. (2026) Displacement stage division and characteristic analysis before failure of Tonglüshan tailings dam based on improved displacement tangent angle method. PLoS One 21(11): e0363796. https://doi.org/10.1371/journal.pone.0363796
Editor: Jamil Afzal, International Islamic University Malaysia, MALAYSIA
Received: April 29, 2025; Accepted: November 10, 2026; Published: November 25, 2026
Copyright: © 2026 Liang et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Data Availability: The data underlying the results presented in the study are available from https://dataspace.copernicus.eu/explore-data/data-collections/sentinel-data/sentinel-1, https://dataspace.copernicus.eu/explore-data/datacollections/sentinel-data/sentinel-2, https://search.asf.alaska.edu and https://data.cma.cn/.
Funding: This work was funded by the Hebei “333 Talent Project” (Grant No. A202101048) and the Key Discipline Project of Hebei Academy of Sciences (Grant No. 491-0401-YBN-DDH4).
Competing interests: The authors have declared that no competing interests exist.
Introduction
Due to continuous mining and decreasing ore grades, global tailings production has increased steadily. As of 2020, approximately 29,000–35,000 tailings dams exist worldwide, storing around 534 billion cubic meters of tailings. Notably, since 1950, over 90% of severe dam failures occurred in dams operating below or at their designed capacity [1]. With rapid societal development, escalating demand for mineral resources has led to a surge in tailings dam construction, consequently increasing the frequency of dam failures [2]. In China, which hosts over 10,000 tailings dams of varying sizes, 113 dam incidents have been reported since 1960. Dam failures (63.3%) and tailings leakage (33.03%) account for the majority of these incidents [3]. This demonstrates the widespread distribution and prominent safety hazards of tailings facilities in China. Catastrophic dam‑failure or leakage events cause heavy casualties and irreversible ecological consequences, as illustrated by the 2008 Xiangfen and 2017 Tonglüshan tailings‑dam disasters. Preventive safety strategies should prioritize early intervention rather than post‑event response. Strengthening early‑stage deformation monitoring is essential, and reliable deformation monitoring and early‑warning systems can greatly mitigate hazards induced by dam collapse.
In recent years, Interferometric Synthetic Aperture Radar (InSAR) has been widely applied to tailings‑dam deformation monitoring [4–6]. It acquires dense coherent point measurements over complex terrain and delivers millimeter‑level displacement observations to support stability assessment [7]. Nevertheless, conventional DInSAR suffers from spatial decorrelation [8,9] and atmospheric artefacts [10,11], limiting measurement accuracy. Time‑series InSAR techniques, including PSInSAR and SBAS‑InSAR, mitigate orbital, atmospheric, DEM‑related and coherence‑induced errors through long‑term time‑series analysis. Representative case studies have adopted SBAS‑InSAR to reveal pre‑failure deformation signals for the Brumadinho [12], Cadia [13], and Lüliang tailings dams [14]. These applications prove InSAR’s strengths of wide spatial coverage, high precision, and long‑term observation capacity [15,16]. Even so, time‑series InSAR has intrinsic drawbacks. The 12‑day revisit interval of Sentinel‑1 cannot match the high sampling frequency of in‑situ sensors and may miss short‑term abrupt deformation precursors [17]. Furthermore, InSAR displacement records are disturbed by atmospheric noise, temporal decorrelation and residual orbital‑terrain errors, generating prominent signal fluctuations that impair the performance of deformation‑stage discrimination algorithms such as the displacement tangent‑angle method [18].
Deformation‑stage division is fundamental for geohazard stability evaluation and pre‑failure early warning for landslides, rockfalls, ground subsidence and tailings‑dam instability. Displacement‑time curves contain dynamic information reflecting the evolutionary process from stable conditions to catastrophic collapse, and accurate identification of phase‑transition points underpins stability judgement, graded threshold setting and failure‑time prediction [19,20]. Geologic materials generally follow the classic three‑stage creep pattern (initial/decelerated, constant‑rate, accelerated deformation); some studies further subdivide the accelerated regime into early‑acceleration, mid‑acceleration and imminent‑failure sub‑phases to form three‑ to five‑stage classification frameworks [19]. Four major technical routes exist for displacement‑time‑series‑based stage identification.
First, rate‑ and acceleration‑threshold‑based criteria. These approaches judge the onset of accelerated deformation once displacement rate or acceleration exceeds a preset critical value. The Fukuzono inverse‑velocity method (INV) and its derivatives extrapolate failure time from rate‑reciprocal trends under accelerated‑creep theory [21,22]. To reduce manual subjectivity when determining the onset‑of‑acceleration (OOA), a multi‑criteria step‑filtering algorithm enables automatic accelerated‑phase detection and highlights the influence of sample quantity and classification percentage on detection outcomes [23]. For mining‑related subsidence, a 1.7 mm/day rate threshold has been used to separate initial, active and decaying deformation periods [24]. Despite straightforward implementation, single rate‑ or acceleration‑based thresholds are strongly site‑specific, and these methods degrade notably under low‑sampling‑rate and noisy conditions [19,21].
Second, the displacement tangent‑angle method. This technique computes the angle between the tangent of cumulative displacement‑time curve and horizontal axis, using a dimensionless metric for phase judgement and alleviating calibration difficulties for step‑like reservoir‑bank landslides [25]. Combined with K‑means clustering and random‑forest classification, it achieves high‑accuracy automatic deformation‑state discrimination. However, tangent‑angle outputs are highly sensitive to raw‑data fluctuations, and performance deteriorates for sparse or noisy time‑series.
Third, mathematical‑fitting and time‑series segmentation approaches. This group of methods fits analytical functions to displacement records and locates phase boundaries from derivatives or curvature extrema. An inverse‑logistic‑function‑based segmentation scheme uses curvature maxima as dividing points and yields good performance for classic landslide datasets [19]. The Fukuzono‑Voight equation has been combined with InSAR observations to distinguish creep phases and back‑predict failure time for loess earthflows [20]. Fast Fourier Transform (FFT)‑based decomposition demonstrates that neglecting periodic deformation components introduces considerable velocity bias [26]. The AVE‑InSAR workflow defines multiple deformation modes for reservoir landslides and links them to water‑level and rainfall forcing [27]. Limitations include empirical dependence when selecting fitting functions, requirements for long monitoring sequences for model convergence, and poor representation of multi‑scale noise within real‑world datasets [19,26].
Fourth, machine‑learning‑driven time‑series segmentation. Transfer‑learning‑enhanced one‑dimensional convolutional networks implement three‑phase automatic classification from displacement records [28]. Affinity‑propagation clustering combined with quantum‑particle‑swarm optimization supports slope‑zoning and monitoring‑point optimization [29]. Unsupervised pipelines integrating TS2Vec representation learning, t‑SNE dimensionality reduction and K‑means clustering separate landslide and subsidence signals [30]. LSTM and Transformer architectures are also applied for displacement trend forecasting [31,32]. Although machine‑learning workflows can extract complex nonlinear features and reduce manual intervention, they require large labelled datasets, suffer from limited physical interpretability, and exhibit weak cross‑case transferability [28,30]. Recent attempts have introduced such machine learning segmentation frameworks into InSAR monitoring of tailings dams, but the generalization ability across different tailings dam types and observation environments remains insufficient [14,33].
Despite the above advances, two important research gaps remain when deploying these algorithms for noisy InSAR displacement time‑series. First, most existing stage‑division approaches are developed for high‑frequency in‑situ monitoring data. Direct application to InSAR products frequently induces phase‑classification errors. Noise‑driven spurious acceleration or deceleration triggers false alarms for noise‑sensitive forecasting tools [21,22]. Line‑of‑sight geometric distortion further distorts displacement‑time profiles and shifts characteristic feature points [27,34]. Reported matching rates between InSAR‑derived hazard identification and field investigation can be as low as ~50%, accompanied by omission and mis‑detection [35]. Second, smoothing‑filter window sizes (e.g., moving‑average) are predominantly selected empirically without systematic quantitative trade‑off evaluation. Improper window settings either retain residual noise or generate severe boundary artefacts and signal distortion [22]. Even moderate filtering can degrade VOA prediction accuracy because of filter‑induced boundary effects [21,22]. Moving‑average decomposition is widely adopted for InSAR time‑series yet lacks objective window‑selection criteria [32]. Few studies construct a quantitative framework balancing noise suppression, signal fidelity and time‑delay for window‑size determination tailored to InSAR datasets [21,22]. These gaps limit the reliability and reproducibility of InSAR‑based deformation‑stage identification for geohazard monitoring.
To address these gaps, this study develops an improved displacement tangent‑angle method integrated with moving‑average smoothing for noisy InSAR time‑series. Quantitative metrics are introduced to support objective smoothing‑window selection. Taking the Tonglüshan tailings dam as the study site, SBAS‑InSAR is used to invert pre‑failure surface deformation and extract time‑series displacement records. The improved displacement tangent‑angle method is implemented to partition dam‑deformation stages. We further analyse temporal‑deformation signatures for different dam sections, quantify precipitation influences on dam deformation, and compare deformation behaviour among inner‑dam and outer‑dam monitoring points to decipher the complete failure‑evolution process of the Tonglüshan tailings dam.
Study area and methods
Study area
The Tonglüshan tailings pond, situated in Quantang Village, Daye City, Hubei Province, is a flat – type pond enclosed by embankments on all sides. It is approximately 1 km long, 0.6 km wide, and covers an area of about 0.56 km2, with geographical coordinates of 114°57′E, 30°5′N (Fig 1). In Fig 1a, the white dashed line outlines the pre-failure water area of the reservoir. After the dam failure (Fig 1b), evident erosion of the tailings in the water area can be observed. At 2:20 a.m. on March 12, 2017, a partial breach took place at the northwest corner of the tailings dam. The breach was about 228 meters long, with a top width of 321 meters and a maximum height of approximately 16 meters. The collapsed section had a volume of roughly 78,700 m2, releasing about 500,000 m3 of tailings slurry. As depicted in Fig 1b, the discharged slurry flooded an area of around 250,000 m2 downstream, submerging fish ponds and destroying a high-voltage transmission tower. The dam failure led to 2 fatalities, 1 missing person, and 6 injuries [36]. To date, the farmland damaged by the tailings slurry has been overgrown with reeds. Since the polluted tailings area contains contaminants such as potassium, cadmium, and zinc, the farmland is unfit for crop cultivation. Moreover, rainwater has washed these pollutants into surrounding rivers, canals, ponds, reservoirs, wells, and roads, creating a vicious contamination cycle. Consequently, the lives of local residents have been severely disrupted, making normal living conditions unattainable [37]. In summary, the Tonglüshan tailings dam failure not only caused loss of life and significant economic damage but also resulted in long – term ecological and environmental pollution.
(a) Image before failure (2017-01-15). The area enclosed by the black dashed line denotes the water body prior to dam failure, and the dots represent two abandoned mines (Zheng, 2018). Fish ponds and farmland are distributed on the downstream side of the tailing pond. (b) Image after failure (2017-03-26). The area marked by the black dashed line indicates the dam-failure section, while the area enclosed by the black solid line represents the scope of loose deposits formed by the dam failure. The optical images are Sentinel-2 data (https://doi.org/10.5270/S2_-znk9xsj).
Methods
SBAS-InSAR
SBAS-InSAR mitigates terrain and atmospheric phase effects by selecting SAR image subsets with small spatial and temporal baselines, thereby improving deformation monitoring accuracy. Its core processing consists of seven steps: master image selection, interferometric subset construction, terrain phase simulation, time series generation, phase unwrapping, error phase removal, and surface time-series deformation extraction. In this study, 50 Sentinel-1A IW mode descending SLC images with VV polarization and a 32.56° incident angle were utilized. Acquired at 12-day intervals from April 18, 2015, to March 2, 2017, these images were sourced from https://dataspace.copernicus.eu/explore-data/data-collections/sentinel-data/sentinel-1. To ensure interferometric accuracy, corresponding precise orbit files were downloaded. For terrain phase removal, 12 m resolution ALOS DEM data (from https://search.asf.alaska.edu), generated in 2008 prior to the tailings dam failure, were employed. Interferometric pairs were selected based on a 5% maximum spatial baseline and 60-day maximum temporal baseline, yielding 164 pairs. The master image, acquired on April 12, 2016, was chosen for its central temporal position. Processing was conducted using the SARscape module in ENVI software, resulting in pre-failure deformation rate and cumulative deformation maps of the Tonglüshan tailings dam.
Improved displacement tangent angle method (IDTAM)
Loose soil and time-dependent rock slopes typically exhibit three-stage creep deformation: initial, constant-rate, and accelerated. The accelerated stage is further divided into initial acceleration, middle acceleration, and imminent failure phases [38]. To identify deformation stages preceding dam failure, an improved displacement tangent angle method was adopted. This method quantifies deformation phases by calculating the angle (α) between the tangent of the cumulative displacement-time curve and the horizontal axis, which represents the curve's slope at a given time [18]. Key equations include:
(1)(2)where ΔT is the transformed displacement per unit time, ΔS is the displacement per unit time, v is the constant-rate deformation velocity, α is the tangent angle, and Δt is the monitoring time interval.
Using Equations 1 and 2, the tangent angle-time curve (Fig 3b) was derived. However, this curve does not clearly reveal the variation pattern of the tangent angle, indicating the need for further refinement or alternative analytical approaches to better interpret the deformation stages.
Considering the Tonglüshan tailings dam as a loose soil slope, point B3 (Fig 2b) at the dam's central section was selected for analysis. Based on its cumulative displacement-time curve, the constant-rate deformation velocity v (−0.82 mm/12 days) was determined from December 2, 2015, to May 30, 2016. Applying equations (1) and (2) generated the tangent angle-time curve; however, it failed to clearly illustrate the tangent angle's variation trends. This outcome underscores the necessity for additional refinement or alternative analytical methods to accurately discern the deformation stages. To address this, a moving average smoothing technique was applied:
(a) The time-series deformation curve is divided into four stages (P1–P4). P1, P2 and P3 represent the initial deformation stage, constant-rate deformation stage, and accelerated deformation stage, respectively, while P4 corresponds to a post-accelerated transitional state. (b) The original unsmoothed tangent-angle curve without smoothing preprocessing. (c) The third-order tangent angle-time curve derived using the Improved Displacement Tangent Angle Method shows distinct regular patterns. Three key stage division time points are identified on day 228, day 408, and day 516, which correspond to December 2, 2015, May 30, 2016, and September 15, 2016, in (a), respectively. (d) For the velocity-reciprocal curve, the black arrow denotes the actual dam-failure time, and the red arrow indicates the predicted dam-failure time.
where βi is the smoothed tangent angle, and αi, αi−1, αi−2 are tangent angles at consecutive time intervals.
The moving average method is a simple smoothing technique that effectively reduces fluctuations in time series data, thereby revealing underlying trends. To further accentuate the characteristics of the tangent angle-time curve, the absolute values of the tangent angles were taken, and the moving average was applied iteratively three times until distinct features emerged (Fig 2c). For comparison, Fig 2b presents the original unsmoothed tangent-angle curve, which is dominated by random noise spikes and lacks a clear evolutionary trend, while Fig 2c shows the smoothed curve obtained by IDTAM, with distinct and physically consistent stage transitions.
Window‑size selection of moving‑average smoothing obeys the classic bias‑variance trade‑off principle for time‑series signal preprocessing. Smaller windows preserve more original signal information yet retain high‑frequency noise that may produce false acceleration peaks; larger windows suppress noise more effectively but may introduce over‑smoothing bias and erase pre‑failure acceleration precursors. Two quantitative metrics, residual‑noise standard deviation (σ) and mean squared error (MSE) within the P3 accelerated‑deformation interval, were calculated for representative point B3 to assess performances of 2‑point to 6‑point windows (Table 1). With increasing window size, residual noise gradually declines while signal distortion increases. We select **the first feasible window after the trade‑off crossover point**, i.e., the 3‑point moving‑average window. The 2‑point window is abandoned due to excessive residual noise that risks false‑positive acceleration identification. The 3‑point window achieves acceptable noise suppression while retaining critical pre‑failure abrupt deformation features. Windows ≥4‑point only provide marginal noise reduction but lead to severe signal distortion. Accordingly, the 3‑point moving‑average window is adopted for tangent‑angle smoothing in this study. Compared with raw tangent‑angle‑time curve, the smoothed curve using 3‑point window presents clearer phase‑transition characteristics across different deformation periods (Fig 3c).
(a) Zones M1, M2, and M3 delineate three relatively large deformation areas. (b) Points W1–W3, symbolized by triangles, are positioned outside the tailings reservoir; points B1–B15, denoted by dots, are located on the dam body; and points N1–N7, indicated by pentagrams, are situated inside the tailings reservoir. The black ring demarcates the boundary of the tailings reservoir's dam body.
Based on the continuity of peaks in the third average tangent angle-time curve and two critical tangent angles (40° and 55°), the deformation process was segmented into four stages (P1-P4), corresponding to time points at 228 days (December 2, 2015), 408 days (May 30, 2016), and 516 days (September 15, 2016). P1-P3 represent initial, constant-rate, and accelerated deformation, respectively. In stage P4, tangent angles fluctuated between 40° and 55°, indicating a post-accelerated transitional state where dam stability depended on external conditions. During this stage, the dam could either stabilize or collapse depending on external conditions. Applying the inverse velocity method [2] using the last four data points predicted a failure date of March 8, 2017—four days before the actual failure on March 12, 2017. This result confirmed that the dam entered an unstable state during the P4 stage, validating the effectiveness of the proposed analytical approach.
Results and discussion
Analysis of overall deformation
Post-disaster imagery (Fig 1b) reveals that the topography of tailings deposits in the central and southern regions of the reservoir remained largely unchanged, while erosion predominantly occurred in the northeastern section. Combining the erosion direction with the newly constructed dam structure, the breach location was identified within the B1-B6 section (Fig 2b).
The deformation rate map (Fig 2a) indicates that deformation primarily occurred in the northern (M1, M2) and eastern (M3) areas of the reservoir, with rates ranging from −32.3 to 8.5 mm/a. Notably, M1 exhibited the highest internal dam deformation, averaging approximately −29.3 mm/a.
The cumulative deformation map (Fig 2b) shows spatial consistency with the deformation rate map, though the locations of maximum cumulative deformation differed. Points N6, N7, and B6, situated in the M2 region, recorded the highest cumulative displacements. In contrast, the M3 area, mainly encompassing the outer dam surface, exhibited relatively minor deformation, consistent with its classification as a small tailings pile based on Fig 1b analysis.
Temporal deformation analysis of tailings dam
To conduct a more comprehensive comparative analysis of the deformation of different parts of the tailings dam, a total of 25 monitoring points were strategically set up. Specifically, three points (W1, W2, and W3) were placed outside the tailings reservoir, fifteen points (B1-B15) were situated on the dam body, and seven points (N1-N7) were located inside the dam body. Time-series deformation diagrams of these points were then extracted and generated using the time-series analysis function (Fig 4).
(a) Time-series deformation curves of points B1–B5 on the dam body of the dam-failure section. (b) Time-series deformation curves of point B3 (on the dam body of the dam-failure section), points N1–N3 (internal dam body), and point W1 (external dam body). (c) Time-series deformation curves of points N3–N7 in the internal dam body. (d) Time-series deformation curves of points B5 and B6 (on the dam body), point N7 (internal dam body), and point W2 (external dam body). (e) Time-series deformation curves of points B3, B7–B10 (on the dam body) and point N1 (internal dam body). (f) Time-series deformation curves of points B3 and B11–B15 on the dam body.
Fig 4a illustrates the time-series deformation of points B1-B5 on the northern dam body. Evidently, point B3, positioned in the middle of the northern dam body, exhibits the maximum cumulative deformation of −39.7 mm, while point B1 shows the smallest at −8.1 mm. Points B2, B5, and B4 have cumulative deformations of −38.4 mm, −29.9 mm, and −19.6 mm, respectively. This indicates that the deformation is greatest in the middle of the northern dam body and gradually decreases towards the two sides.
Based on the ‘peak + interval continuity’ feature of the three-time average tangent angle-time curve in Fig 2c, analysis of the numerical distribution and interval continuity of the peaks in the curve reveals that under the same deformation trend, a tangent angle peak will occur, and this peak forms a continuous interval with its adjacent regions. When the peak breaks through this interval, it indicates that the dominant deformation mechanism has changed, i.e., a new deformation stage has been entered. In accordance with this principle, the cumulative deformation curve of point B3 was divided into four stages: P1, P2, P3, and P4 (Fig 4a) through time-series deformation staging. Linear fitting of the deformation curves for each stage yielded average deformation rates of −0.22, −0.82, −1.53, and −0.68 mm/12d, respectively. The analysis reveals that the deformation rate of point B3 increased from P1 to P3 and then decreased in P4. Notably, the average deformation rate in P3 was 7.0 times that of P1, 1.9 times that of P2, and 2.3 times that of P4, with the maximum deformation amount of 15.5 mm occurring in P3. In P1, the cumulative deformation amounts of B1, B3, and B4 were small (≤ 5 mm), whereas those of B2 and B5 were relatively large (≈ 10 mm). In P2, the deformation rates of B1 and B4 changed slightly, while that of B3 began to increase. By the end of P3, the cumulative deformation of B3 was approximately equal to those of B2 and B5. In P3, the deformation rate of B3 continued to rise and became similar to that of B2, while the rates of B1, B4, and B5 decreased relatively. In P4, except for B1, the deformation rates of B4 and B5 increased, while those of B2 and B3 decreased, and the rates of these four points became roughly equal. Overall, most points showed deformation differences initially, but their deformation rates tended to converge in the final stage, suggesting that the northern dam body of the tailings reservoir might be undergoing overall and consistent deformation.
Fig 4b presents the cumulative deformation diagram of point B3 on the northern dam body, points N1, N2, and N3 inside the dam body, and point W1 outside. The cumulative deformation amounts of N1, N2, and N3 inside the dam body were basically equal (−48.8 mm, −48.6 mm, and −47 mm, respectively), and the cumulative deformation of W1 outside (−45.4 mm) was relatively smaller, yet all were larger than that of B3 (−39.7 mm). When compared with the four stages of B3's deformation curve, N1 and N2 maintained consistent deformation rates in P1 and P2, which were higher than those of B3 in the same stages, with cumulative deformation amounts of about 22.2 mm in these two stages. And the deformation accelerated in P3 with a rate of −1.55 mm/12d and decelerated in P4 with an average rate of −0.68 mm/12d, similar to that of B3. N3 and B3 were consistent in P1 and P2, but the average deformation rate of N3 in P3 (−2.44 mm/12d) exceeded those of B3, N1, and N2, and it matched N1 and N2 in P4. The cumulative deformation trend of W1 outside was generally consistent with that of B3, with cumulative deformation amounts in each stage larger than B3 but smaller than N1 and N2.
Comparing the deformations of B3 on the northern dam body, N1, N2, and N3 inside, and W1 outside, it was found that the deformation trends of the northern dam body were similar to those inside and outside the dam body. The cumulative deformation amounts inside and outside the northern dam body were not significantly different but both exceeded that of the dam body itself. This suggests that the M1 area (including B3, N1-N3, and W1) likely shared the same deformation inducing factor. Moreover, the deformations inside and outside the northern dam body occurred earlier than that of the dam body, implying that they might have triggered the dam body's deformation. The deformation differences between the inside/outside and the dam body eventually led to the generation and penetration of cracks in the dam body.
As depicted in Fig 4c, point N6 had the largest cumulative deformation (−52 mm) among N3-N5 and N7. The deformation trends of N4-N7 differed from those of B2, B3, N1-N3, and W1 (Fig 4a and 4b). During P1 and P2, based on B3's four deformation stages, the average deformation rate of N4-N7 was about −0.60 mm/12d. In P3, the deformations of N4 and N5 accelerated (average rate: −1.46 mm/12d), while N6 and N7 had negligible deformations (rate ≈ 0 mm/12d). In P4, the average deformation rates of N4, N5, N6, and N7 were approximately −0.84, −1.62, −2.44, and −2.60 mm/12d, respectively, with N6 and N7 having higher rates than N4 and N5. Comparing Fig 4c with Fig 4a and 4b, N4 showed a similar deformation trend change (acceleration in P1, P2 → P3 and deceleration in P3 → P4) to N1-N3, B2, B3, and W1, while N6 and N7 resembled B4 and B5 with a deceleration in P1, P2 → P3 followed by acceleration in P3 → P4. The deformation trend of N5 was intermediate, suggesting it could be a transition part for differential deformation in the dam body, indicating that regions M1 and M2 (Fig 2a) of the dam body had two types of deformations with different causes.
Specifically, the deformation in M1 is primarily driven by subsurface goaf collapse and associated foundation differential settlement. Abandoned underground mine workings beneath the northern dam body undergo long-term roof creep and progressive caving, which compacts overlying strata and drives concentric settlement centered at point B3, with deformation magnitudes decreasing symmetrically toward both sides. This mechanism is directly supported by the synchronized large-magnitude deformation observed at inner-dam (N1–N3), dam-body (B3) and outer-dam (W1) points in M1, as well as the identified goaf collapse time around 30 May 2016. In contrast, deformation in M2 reflects a coupled damage-propagation and rainfall-infiltration process. As differential settlement develops in M1, tensile stress propagates into the M2 dam body and generates internal tensile cracks. Subsequent rainfall infiltrates downward through these cracks, elevating pore water pressure and reducing tailings shear strength. This mechanism explains the distinct deformation pattern in M2: points N4–N7, B5–B6 and W2 show negligible deformation in the P3 stage, but accelerate rapidly in the P4 stage, representing the delayed response to cumulative tensile damage and lagged rainfall infiltration, rather than direct foundation collapse.
Fig 4d shows that among the four points, N7 had the largest cumulative deformation (−51.2 mm), and B5 had the smallest (−29.9 mm). N7 and B5 had similar deformation trends, with N7 undergoing accelerated deformation in the fourth stage at an average rate of −2.60 mm/12d, 2.4 times that of B5 (−1.10 mm/12d). B6 and W2 had essentially the same deformation trends, featuring rapid deformation in the early stage, similar to N5-N7 (Fig 4c). In terms of spatial distribution, the deformations of W2 outside and distant B6 were consistent. In P1 and P2, their cumulative deformation amounts were roughly the same as those of B5 and N7 (Fig 4c). And in the first half of P3 and P4, they were slightly larger than B5 and N7, but in the second half of P4, the cumulative deformation amounts of W2 and B6 were quickly surpassed by that of N7. These four points belonged to the M2 area, where the deformation was relatively complex, implying that the deformation discrepancies in M2 were due to various causes.
By comparing Fig 4e with Fig 4b and 4c, it was concluded that the deformation trends of points B7-B10 on the eastern dam body were generally consistent with those of the M1 area of the northern dam body, but the values of the cumulative deformation amounts were lower. Similar to B3, the cumulative deformation amounts of B7-B10 in the four stages lagged behind those of N1-N7. It is speculated that the deformation of B7-B10 was caused by the sliding of the soil mass inside the dam body, possibly triggered by the water leakage of the tailings reservoir and the subsequent drop in the water surface, leading to the instability of the internal soil mass. As shown in Fig 4f, compared with the northern and eastern dam bodies, the cumulative deformation amounts of the southern and western dam bodies were relatively small, with those of points B11-B15 being less than 15 mm. Thus, the area with a cumulative deformation amount of less than 15 mm can be considered as the deformation caused by normal consolidation.
Determination of collapse time in goaf
The collapse of the goaf induces significant subsidence, characterized by the following features: before the collapse, the difference in surface deformation is minor; after the collapse, within the subsidence-affected area, the deformation gradually decreases from the collapse center to the surrounding areas, and the dam body and the lower part of the dam (including the internal and external regions of the dam) exhibit large-scale and similar deformations simultaneously.
Based on the above characteristics and combined with the analysis of InSAR monitoring data: among the monitoring points B1-B5, which are equally spaced from left to right on the dam body, the deformation shows a pattern of “decreasing from point B3 (as the center) to both sides.” Accordingly, it can be determined that the area directly below point B3 is the goaf collapse center (Fig 4a). Moreover, after the transition from the P2 stage to the P3 stage, the deformations of points B1-B5 show obvious differentiation. Meanwhile, at the time node of the transition from the P2 stage to the P3 stage, point B3, together with the external monitoring point W1 of the dam and the internal monitoring points N1-N3 of the dam, synchronously undergoes large-scale deformation (Fig 4b). This further confirms that the goaf collapse occurred at the time of the P2-P3 stage transition. Due to the 12-day revisit interval of Sentinel-1 satellite images, it is impossible to determine the exact date; thus, the goaf collapse time is determined to be around May 30, 2016.
Analysis of precipitation influence on tailings dam deformation
Based on the above analysis, point B3 on the tailings dam body is identified as the location experiencing the greatest deformation. To investigate the influence of precipitation on the dam breach, this study superimposed the cumulative deformation data of point B3 on the northern dam body with the precipitation data (data sourced from the National Meteorological Science Data Center for the period 2015–2017, available at https://data.cma.cn/). This resulted in the generation of a deformation-precipitation curve (Fig 5). From 2015 to 2017, the study area witnessed an annual precipitation of 1546 mm, translating to a monthly average of 129 mm. However, the precipitation was unevenly distributed over time, predominantly concentrated between April and July, and exhibited interannual variations.
Analysis of the data revealed that the dam body of the tailings reservoir underwent four distinct deformation stages: initial deformation (P1), uniform velocity deformation (P2), accelerated deformation (P3), and post-accelerated deformation (P4) (Fig 5). During stage P1, which coincided with the rainy season, precipitation gradually increased, peaking at a monthly maximum of 288 mm. Correspondingly, the initial deformation of the dam body was relatively slow. In stage P2, as precipitation increased from a lower to a higher level, the dam body transitioned into the stage of uniform velocity deformation. Stage P3 was characterized by a sudden surge in precipitation, reaching its maximum of 371 mm. Concurrently, the dam body experienced rapid deformation, which subsequently decreased as precipitation diminished in the later part of this stage. In stage P4, with a further reduction in precipitation, the deformation speed of the dam body decreased, marking the entry into the post-accelerated deformation stage, where the deformation level reverted to that observed in the latter part of stage P3.
An examination of the consistency between the precipitation changes and the deformation of point B3 led to the conclusion that while precipitation is not the direct trigger for the deformation of the tailings dam, it plays a facilitating role in the dam body's deformation process. Notably, the rapid acceleration of deformation was found to be closely associated with sudden increases in precipitation.
To quantitatively evaluate the coupling between precipitation and deformation, we calculated the Pearson correlation coefficient between average daily precipitation and average deformation rate across the four deformation stages. The full four-stage correlation coefficient is approximately 0.48, indicating a moderate overall association. In the P1 initial deformation stage, the dam structure remained intact and deformation was dominated by goaf creep, so precipitation contributed weakly to deformation rate. After tensile cracks developed in the dam body, the correlation coefficient across P2–P4 stages reached approximately 0.99, reflecting extremely strong positive coupling between rainfall intensity and deformation rate. This abrupt increase in correlation after crack formation directly verifies the mechanism that precipitation promotes deformation by infiltrating through tensile cracks and elevating pore water pressure.
Discussion on the phenomenon of decreased deformation rate at the P4 stage
The core characteristic of the P4 stage (post-accelerated deformation stage) of the Tonglüshan tailings dam is the transition of the deformation rate from the rapid increase in the P3 stage to a relatively gentle state. Taking the typical monitoring point B3 as an example, its average deformation rate decreased from −1.53 mm/12d in the P3 stage to −0.68 mm/12d in the P4 stage. It should be clarified that this “deceleration” phenomenon is not a sign of the dam’s stability recovery, but an external manifestation of its internal structure and mechanical state entering a critical stage of “stress redistribution and crack evolution stagnation.” Its formation mechanism is directly related to the coupling effects of soil mechanical responses after goaf collapse, changes in rainfall conditions, and the evolution of physical properties of the sliding zone soil.
Combined with on-site inspection records and temporal deformation characteristics, the “low-rate deformation” in the P4 stage is highly consistent with the concealed characteristics of the tailings dam before failure. According to Zheng (2018)’s description of the failure process of tailings dams in this area, the final instability of the dam occurred suddenly and instantaneously, with no visible-to-the-naked-eye significant deformation before the failure. This is completely consistent with the “low-rate and weak-fluctuation” deformation characteristics of the P4 stage, and forms a contrast with the obvious failure precursors in the P3 stage (accelerated deformation) (Fig 2). This phenomenon indicates that the P4 stage is not the “stable end period” of deformation, but a critical window period for the transition from “macroscopic acceleration” to “microscopic critical instability.” Beneath its low-rate appearance lies the dynamic reconstruction of the internal mechanical balance of the dam.
The decrease in deformation rate in the P4 stage is essentially the result of the combined effects of the reconstruction of internal effective stress of the soil, the evolution of pore water pressure, and the weakening of external rainfall interference, which can be analyzed through the logical chain of “early-stage damage → mid-stage adjustment → late-stage critical state.” A. The “pre-damage” in the early P3 stage lays the mechanical foundation. In the P3 stage, local collapse of the dam was caused by goaf collapse, resulting in a large number of penetrating initial cracks in the dam soil (on-site surveys found that the maximum width of the cracks reached 20 cm). During this stage, continuous heavy rainfall (with an average rainfall of 11.5 mm/d, Fig 5) infiltrated rapidly through the cracks: on the one hand, it increased the self-weight of the soil and the sliding force; on the other hand, it significantly increased the soil saturation and pore water pressure, leading to a sharp decrease in effective stress. According to the principle of effective stress, the shear strength of the soil decreases linearly with the reduction of effective stress. Eventually, the gravitational component exceeded the anti-sliding force, which was manifested as accelerated deformation in the P3 stage. During this process, the dam soil completed the “accumulation of initial damage,” laying the groundwork for the mechanical adjustment in the P4 stage. B. The “mechanical adjustment” in the P4 stage dominates the deceleration. After entering the P4 stage, dual changes in the internal and external environments drove the reconstruction of the soil’s mechanical state, ultimately resulting in a decrease in the deformation rate. The external rainfall interference weakened significantly: the average rainfall in the P4 stage dropped to 2.3 mm/d, only 1/6 of that in the P3 stage (Fig 5). The amount of rainwater infiltration was much lower than that in the P3 stage. Moreover, the initial cracks formed in the P3 stage were displaced and closed during the dam sliding process, with their integrity damaged, which further blocked the rapid infiltration path of rainwater and fundamentally reduced the external incentives for the increase in pore water pressure. During the rapid sliding of the dam in the P3 stage, the sliding zone soil generated local heat due to frictional shear, accelerating the evaporation and discharge of pore water; at the same time, the reduction in rainfall led to a continuous decrease in soil moisture content. According to the theory of unsaturated soil mechanics, the soil exhibits unsaturated characteristics under low moisture content conditions: the total suction formed by capillary suction and additional internal pressure increases significantly, enhancing the compaction effect between particles, restoring the effective stress, and thus recovering the soil strength. The recovery of soil shear strength temporarily inhibited the development of deformation, which was manifested as a significant decrease in the deformation rate in the time series.
The identification of the “deceleration” phenomenon in the P4 stage is of great significance for soil deformation monitoring and early warning. It should be emphasized that the decrease in deformation rate in the P4 stage is a temporary balance state resulting from the dynamic game between sliding force and anti-sliding force, rather than the final sign of dam stability. The recovery of soil shear strength depends on the environmental conditions of “low moisture content and low pore water pressure,” while irreversible structural damage already exists inside the soil, and the soil strength is lower than its initial state. Once external disturbances break the current balance, it is highly likely to trigger a chain reaction of “low rate → sudden acceleration → instability.” Therefore, in-depth analysis of the mechanism of decreasing deformation rate in the P4 stage not only avoids misjudging “low-rate deformation” as “stability” (which would lead to missing the early warning opportunity) but also plays an important role in promoting the refined reconstruction of tailings dam early warning models.
Discussion on failure process analysis of Tonglüshan tailings dam
Historical records indicate that multiple mine shafts were present within the Tonglüshan tailings reservoir. Notably, the northern part of the reservoir and its northern dam body experienced collapses and extensive settlements, with a vertical displacement reaching up to 1.08 m [39]. This evidence strongly suggests that the collapse of the goaf in the northern region of the tailings reservoir was the direct cause of the dam breach.
Based on the spatiotemporal deformation patterns from SBAS-InSAR and site accident records, the full mechanical transmission path from goaf collapse to dam breach can be reconstructed qualitatively. Progressive caving and compaction of goaf roof strata first generate uneven foundation settlement beneath the northern dam section, forming a concentric subsidence bowl centered at B3. This differential support induces additional tensile and shear stress in the overlying loose tailings dam body, exceeding its low tensile strength and initiating internal tensile cracks. These cracks act as preferential flow paths for concentrated rainfall during the accelerated deformation stage: rapid infiltration elevates pore water pressure, reduces effective stress, and lowers tailings shear strength, driving the observed accelerated deformation. Tensile damage progressively propagates outward from the M1 settlement zone to the adjacent M2 section, explaining the lagged, delayed acceleration observed at M2 points during the post-peak stage. As rainfall decreases and pore pressure dissipates, the dam enters a temporary low-rate critical state, while internal cracks gradually connect into a continuous sliding surface; instantaneous breach occurs once shear resistance can no longer balance gravitational sliding force.
During the period from April 18, 2015, to December 2, 2015, the goaf was situated at depths ranging from −6.7 to −34.4 m beneath the northern dam body of the Tonglüshan tailings reservoir [40]. Progressive deformation and settlement of the goaf roof induced subsidence of the underlying strata. This process initially manifested as deformations on both the inner and outer sides of the dam body within area M1. As the dam foundation sank, stress concentrated on the weak structural planes of the soil mass, leading to creeping deformation in the middle section of the dam body. Significantly, the middle part, which exhibited the most pronounced deformation, was also the first to experience damage, consistent with on-site investigation findings [36], reflecting the initial stage of foundation settlement induced by long-term goaf creep.
From December 2, 2015, to May 30, 2016, increased deformation of the goaf roof accelerated the displacement rates of the lower strata and dam foundation, marking the onset of the uniform-velocity deformation stage. During this phase, visible deformations emerged both internally and externally, and the dam rupture zone began to take shape, corresponding to the initiation of tensile cracks in the dam body driven by uneven foundation settlement.
Between May 30, 2016, and September 15, 2016, the roof of the goaf beneath area M1 collapsed around May 30, 2016 [40], initiating fracture surface formation. Concurrently, a sudden influx of precipitation infiltrated the soil mass, increasing the dam's weight and elevating pore water pressure [41]. These factors rapidly reduced soil strength, triggering accelerated dam deformation. As precipitation declined, pore water pressure dissipated, causing a corresponding slowdown in the deformation rate, matching the rainfall-infiltration weakening stage of the reconstructed mechanical path.
From September 15, 2016, to March 12, 2017, the severe deformation in area M1 triggered a cascading effect, inducing significant deformation in area M2 by around September 15, 2016. The cumulative deformations in both regions ultimately led to the complete penetration of the internal fracture surface, culminating in the dam breach on March 12, 2017. Given the absence of in-situ geomechanical parameters for quantitative numerical modelling, this mechanical reconstruction remains qualitative; quantitative validation via FLAC3D simulation will be conducted in future work.
Conclusions
In summary, the main findings of this study are as follows:
- (1). This study combines SBAS‑InSAR monitoring and the improved Displacement Tangent Angle Method (IDTAM) to accurately identify the deformation stages of the Tonglüshan tailings dam, systematically analyze the regional deformation differences and the coupling relationship between precipitation and deformation, and reveal the dam failure mechanism. The results demonstrate the great application potential of InSAR for the safety monitoring of tailings dams.
- (2). This study constructs the IDTAM by incorporating a three‑point moving‑average smoothing strategy into the traditional displacement tangent angle method. The 3‑point smoothing window is quantitatively determined based on the bias‑variance trade‑off between residual noise and signal distortion, which can effectively suppress noise in low‑frequency InSAR LOS displacement time series while preserving the critical pre‑failure acceleration features. Combined with the continuity constraint of tangent‑angle peaks and two critical angle thresholds (40° and 55°), the proposed method enables the four‑stage division of tailings dam deformation: initial deformation (P1), constant‑rate deformation (P2), accelerated deformation (P3), and post‑accelerated transitional deformation (P4). Further work is still required to fully explore diverse deformation trends associated with different peak states.
- (3). InSAR spatiotemporal deformation monitoring reveals two major deformation zones (M1 and M2) in the northern part of the Tonglüshan tailings dam with distinct deformation mechanisms. Deformation of zone M1 is dominated by goaf collapse and foundation differential settlement, characterized by synchronous large deformation at monitoring points inside, on, and outside the dam; zone M2 presents delayed acceleration features, which is mainly controlled by tensile crack propagation and subsequent rainfall infiltration.
- (4). The goaf collapse occurring beneath zone M1 around 30 May 2016 is identified as the direct trigger of dam failure. Foundation settlement induced by goaf collapse generates tensile cracks in the overlying tailings, and subsequent rainfall infiltration increases pore water pressure and reduces shear strength, jointly promoting the accelerated deformation of the dam. The post‑accelerated transitional stage (P4) with a declining deformation rate does not represent restabilization of the dam. It corresponds to a temporary mechanical equilibrium resulting from reduced rainfall, partial closure of tensile cracks and partial recovery of soil effective stress. Since irreversible internal damage has already accumulated inside the dam, this stage serves as a critical precursor window prior to sudden dam breach.
- (5). Rainfall is not the direct trigger of dam deformation, but it plays a prominent promoting role after tensile cracks develop within the dam. The Pearson correlation between daily rainfall and deformation rate evolves from weak correlation in P1 to extremely strong correlation in P2–P4 (r ≈ 0.99), confirming that rainfall drives dam deformation primarily via infiltration into pre‑existing tensile cracks.
The IDTAM optimizes trend characterization for low‑frequency InSAR time series rather than eliminating the low‑frequency limitation itself. It is necessary to recognize the inherent drawbacks of single‑orbit InSAR, including low revisit frequency, one‑dimensional LOS ambiguity, temporal decorrelation, atmospheric delay and geometric shadow effects. Owing to the absence of ascending‑orbit data and pre‑failure high‑precision topographic data, we could not quantitatively separate LOS displacement into vertical and horizontal components; nevertheless, geometric sensitivity analysis verifies that this one‑dimensional measurement limitation will not introduce qualitative bias to our core conclusions. This method is developed and validated for homogeneous upstream tailings dams and adapts to the creep features of loose homogeneous tailings. For rockfill dams, zoned earth dams and paste tailings dams with different deformation patterns, further parameter calibration and multi‑case verification are required before engineering application. Future research will focus on multi‑source data fusion (InSAR combined with high‑temporal‑resolution GNSS and deep deformation inclinometer measurements) and multi‑orbit joint inversion to compensate for the above constraints.
Acknowledgments
The authors are grateful to the anonymous reviewers for their valuable suggestions and to the ESA – Sentinel Data Platform for distributing free Sentinel satellite remote sensing data.
References
- 1.
Bowker LN, Chambers DM. The risk, public liability, & economics of tailings storage facility failures. Earthwork Act. 2015; 24:1–56.
- 2. Gama F, Mura JC, Paradella R, de Oliveira G. Deformations prior to the Brumadinho dam collapse revealed by Sentinel-1 InSAR data using SBAS and PSI techniques. Remote Sens. 2020;12(21):3664.
- 3. Zhang JR, Liu JL. Statistics and cause analysis of dam break and leakage accidents of tailings reservoirs in China. China Molybdenum Ind. 2019;43(4):10–3.
- 4. Paradella WR, Ferretti A, José CM, Colombo D, Gama FF, Tamburini A, et al. Mapping surface deformation in open pit iron mines of Carajás Province (Amazon Region) using an integrated SAR analysis. Eng Geol. 2015;193:61–78.
- 5. Mura JC, Gama FF, Paradella WR, Negrão P, Carneiro S, De Oliveira CG, et al. Monitoring the Vulnerability of the Dam and Dikes in Germano Iron Mining Area after the Collapse of the Tailings Dam of Fundão (Mariana-MG, Brazil) Using DInSAR Techniques with TerraSAR-X Data. Remote Sens. 2018;10(10):1507.
- 6.
Ammirati L, Mondillo N, Calcaterra D, Di Martire D. Sentinel-1 data for monitoring a pre-failure event of tailings dam. In: Rizzo P, Milazzo A, editors. European Workshop on Structural Health Monitoring. Cham: Springer; 2021.
- 7. Gama FF, Paradella WR, Mura JC, de Oliveira CG. Advanced DINSAR analysis on dam stability monitoring: A case study in the Germano mining complex (Mariana, Brazil) with SBAS and PSI techniques. Remote Sens Appl: Soc Environ. 2019;16:100267.
- 8. Amelung F, Galloway DL, Bell JW, Zebker HA, Laczniak RJ. Sensing the ups and downs of Las Vegas: InSAR reveals structural control of land subsidence and aquifer-system deformation. Geol. 1999;27(6):483.
- 9. Schmidt DA, Bürgmann R. Time‐dependent land uplift and subsidence in the Santa Clara valley, California, from a large interferometric synthetic aperture radar data set. J Geophys Res. 2003;108(B9).
- 10. Li ZW, Ding XL, Liu GX. Modeling atmospheric effects on InSAR with meteorological and continuous GPS observations: algorithms and some test results. J Atmos Sol-Terr Phys. 2004;66:907–17.
- 11. Zebker HA, Rosen PA, Hensley S. Atmospheric effects in interferometric synthetic aperture radar surface deformation and topographic maps. J Geophys Res. 1997;102(B4):7547–63.
- 12. Grebby S, Sowter A, Gluyas J, Toll D, Gee D, Athab A, et al. Advanced analysis of satellite data reveals ground deformation precursors to the Brumadinho Tailings Dam collapse. Commun Earth Environ. 2021;2(1).
- 13. Bayaraa M, Sheil B, Rossi C. InSAR and numerical modelling for tailings dam monitoring–the Cadia failure case study. Géotechnique. 2024;74(10):985–1003.
- 14. Duan HZ, Li YS, Jiang HB, Li Q, Jiang WL, Tian YF, et al. Retrospective monitoring of slope failure event of tailings dam using InSAR time-series observations. Nat Hazards. 2023;117(3):2375–91.
- 15. Liu YY, Yan X. Analysis on the key issues of large-scale ground deformation monitoring with multi-temporal InSAR technique. J East China Univ Technol (Nat Sci). 2021;44(1):68–74.
- 16. Xu K, Liu XT, He JJ, He JJ, Fan JL, Zhou ZG. Impervious surface information estimation based on InSAR in Nanchang area. J East China Univ Technol (Nat Sci). 2021;44(1):75–81.
- 17. Wang Y, Liu DL, Dong J, Zhang L, Guo JC, Liao MS. On the applicability of satellite SAR interferometry to landslide hazards detection in hilly areas: A case study of Shuicheng, Guizhou in Southwest China. Landslides. 2021;18:2609–19.
- 18. Xu Q, Zeng YP, Qian JP, Wang CJ, He CJ. Study on an improved tangential angle and the corresponding landslide prewarning criteria. Geol Bull China. 2009;28(4):501–5.
- 19. Bao L, Zhang G, Hu X, Wu S, Liu X. Stage division of landslide deformation and prediction of critical sliding based on inverse logistic function. Energies. 2021;14(4):1091.
- 20. Zhang Y, Meng XM, Novellino A, Dijkstra T, Chen G, Jordan C, et al. Characterization of pre-failure deformation and evolution of a large earthflow using InSAR monitoring and optical image interpretation. Landslides. 2022;19:35–50.
- 21. Sharifi S, Macciotta R, Hendry MT. Critical assessment of landslide failure forecasting methods with case histories: a comparative study of INV, MINV, SLO, and VOA. Landslides. 2024;21(7):1629–43.
- 22. Sharifi S, Macciotta R, T M. A reliability evaluation of four landslide failure forecasting methods in real‑time monitoring applications. Landslides. 2024;21(10):2545–56.
- 23. Valletta A, Carri A, Segalini A. Definition and application of a multi‑criteria algorithm to identify landslide acceleration phases. Georisk. 2022;16(3):555–69.
- 24. Jiang X, Li X, Li J, Hu X. Examining subsidence change regularity in high groundwater level coal mining areas using Sentinel-1A time-series data. Nat Hazards. 2024;120(12):11239–53.
- 25. Zhang Y, Tian S, Gong W, Zhao C, Tang H. Adaptive interval prediction method for step-like landslide displacement with dynamic switching between different deformation states. Bull Eng Geol Environ. 2023;82(11):403.
- 26. Hastaoglu KO, Poyraz F, Erdogan H, Tiryakioglu I, Ozkaymak C, Duman H, et al. Determination of periodic deformation from InSAR results using the FFT time series analysis method in Gediz Graben. Nat Hazards (Dordr). 2023;117(1):491–517. pmid:36846809
- 27. Li LJ, Zhou ZK, Yao X, Li RJ, Dai FC, Wang B, et al. Classifications and revealing long‑time deformation trends of retrogressive, progressive, and complex landslides in the Xiluodu reservoir area using InSAR technologies. Nat Hazards. 2025;121(18):20985–1005.
- 28. Du XH, Lian C, Li YP, Qi ZY, Tang ZY, Yuan J, et al. Adaptive classification of landslide displacement evolution states through multi-landslide data transfer learning. Nat Hazards. 2025;121(10):11915–30.
- 29. Li YZ, Shen JH, Zhang WX, Zhang KQ, Peng ZH, Huang M. Slope deformation partitioning and monitoring points optimization based on cluster analysis. J Mt Sci. 2023;20(8):2405–21.
- 30.
Tang XC, Zhang L, Dong YB, Wang B, Xiao P, Xu H, et al. An Unsupervised Machine Learning Approach for Identifying Active Landslides and Subsidence Using InSAR Time Series. In: IGARSS 2025 - 2025 IEEE International Geoscience and Remote Sensing Symposium. 2025. 8529–32. https://doi.org/10.1109/igarss55030.2025.11243203
- 31. Liang H, Yang T, Zhang YW, Hu XY, Yu DJ, Yang X, et al. Evolution characteristics of land subsidence in Liaocheng City. Environ Earth Sci. 2025;84(17).
- 32. Cai JN, Ming DP, Liu F, Zhao WY, Zhang MZ, Ling X, et al. An enhanced spatiotemporal prediction method on landslide displacement with LDP-ConvFormer and MT-InSAR observations. ISPRS J Photogramm Remote Sens. 2026;232:594–612.
- 33. Huang YW, Ma HC, Li Q, Chang M, Huang SB, Lu LJ. The deformation characteristics analyses of reactivate water-rich landslide based on DS-InSAR monitoring technology. Nat Hazards. 2025;121(17):20129–46.
- 34. Du JT, Song C, Li ZH, Tomás R, Li Z. Kinematic behavior and sliding geometry of large anthropogenic-induced landslides using three-dimensional time series InSAR: Insights from the Li-Kan Road landslide. Landslides. 2025;22(10):3319–33.
- 35. Zhang ZK, Duan P, Li J, Chen DY, Peng K, Fan CP. A time‑series InSAR processing chain for wide‑area geohazard identification. Nat Hazards. 2023;118(1):691–707.
- 36.
Zheng ZY. Study on the rheological characteristics of tailing and dynamic characteristics of dam break in cupric iron tailings pond. Shanghai Jiao Tong University; 2018.
- 37.
Huangshi People’s Government. Public list of the letters and calls handled regarding the central ecological and environmental protection inspection and the rectification progress during the inspection (second batch). 2021. Available from: http://www.huangshi.gov.cn/ztjj/zyhjbhdc/bdbg/202109/t20210910_833605.html
- 38. Xu Q, Zeng YP. Research on acceleration variation characteristics of creep landslide and early-warning prediction indicator of critical sliding [J]. Chin J Rock Mech Eng. 2009;28(6):1100–6.
- 39. Li XJ. Subsidence control of the tailings pond dam body in Tonglüshan mine. China Mine Eng. 2005;34(6):18–21.
- 40.
Huangshi Emergency Management Bureau. Investigation report on the “March 12” relatively serious dam collapse accident of the tailings pond of Tonglüshan copper-iron mine of Daye Nonferrous Metals Co., Ltd. 2017. Available from: http://yjj.huangshi.gov.cn/xxgk/qtzdgknr/sgxx/201807/t20180719_234176.html
- 41. Qiao L, Meng XM, Chen G, Zhang Y, Guo P, Zeng RQ, et al. Effect of rainfall on a colluvial landslide in a debris flow valley. J Mt Sci. 2017;14:1113–23.

관련 뉴스