Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Units 3 and 4; Exemptions
Nivis AI 요약
On Tuesday, Iraqi Prime Minister Ali Al‑Zaidi announced the dismissal and suspension of several senior security and government officials. He also ordered federal authorities to assume control of every border crossing in the Kurdistan Region of Iraq. The measures were taken after an investigation linked the state‑run North Oil Company to oil smuggling activities. The federal government plans to manage the crossings directly to curb the illicit trade. The move signals a tightening of Baghdad’s oversight over the autonomous Kurdish region’s borders.
[Federal Register Volume 91, Number 225 (Tuesday, November 24, 2026)]
[Notices]
[Pages 75886-75889]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-23887]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2026-4621]
Southern Nuclear Operating Company; Vogtle Electric Generating
Plant, Units 3 and 4; Exemptions
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing
exemptions in response to a request dated April 27, 2026, from Southern
Nuclear Operating Company (SNC, the licensee) to allow the
implementation of the American Society of Mechanical Engineers Code
Case N-921 after the start dates of the first Inservice Inspection
interval at Vogtle Electric Generating Plant (Vogtle), Units 3 and 4.
DATES: The exemptions were issued on November 17, 2026.
ADDRESSES: Please refer to Docket ID NRC-2026-4621 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2026-4621. Address
questions about Docket IDs in Regulations.gov to Bridget Curran;
telephone: 301-415-1003; email: [email protected]. For technical
questions, contact the individual listed in the For Further Information
Contact section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin ADAMS Public Search.''
For problems with ADAMS, please contact the NRC's Public Document Room
(PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email
to [email protected]. The exemption request dated November 17, 2026,
is available in ADAMS under Accession No. ML26275A111.
NRC's PDR: The PDR, where you may examine and order copies
of publicly available documents, is open by appointment. To make an
appointment to visit the PDR, please send an email to
[email protected] or call 1-800-397-4209 or 301-415-4737, between 8
a.m. and 4 p.m. Eastern Time (ET), Monday through Friday, except
Federal holidays.
FOR FURTHER INFORMATION CONTACT: Robert Fisher, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-6328; email: [email protected].
SUPPLEMENTARY INFORMATION: The text of the exemption is attached.
Authority: 42 U.S.C. 2011 et seq.
Dated: November 20, 2026.
For the Nuclear Regulatory Commission.
Robert Fisher,
Project Manager, Operating Reactor Licensing Branch 2, Division of
Licensing Projects I, Office of Nuclear Reactor Regulation.
Attachment--Exemption
NUCLEAR REGULATORY COMMISSION
Docket Nos. 52-025 and 52-026
Southern Nuclear Operating Company
Vogtle Electric Generating Plant, Units 3 and 4
Exemptions
I. Background.
Southern Nuclear Operating Company (SNC, the licensee) is the
holder of Combined License Nos. NPF-91 and NPF-92 for the Vogtle
Electric Generating Plant (Vogtle), Units 3 and 4, respectively. The
licenses state, among other things, that the licensee is subject to all
rules, regulations, and orders of the U.S. Nuclear Regulatory
Commission (NRC, the Commission) now or hereafter in effect. These
facilities consist of two pressurized-water reactors located at the
licensee's site in Burke County, Georgia, respectively.
On July 17, 2024, NRC issued a final rule incorporating by
reference Regulatory Guide (RG) 1.147, ``Inservice Inspection Code Case
Acceptability, ASME Section XI, Division 1,'' Revision 21 (Agencywide
Documents Access and Management System (ADAMS), Accession No.
ML23291A003), into Title 10 of the Code of Federal Regulations (10 CFR)
50.55a(3)(ii) (89 FR 58039). This RG determined American Society of
Mechanical Engineers Boiler and Pressure Vessel Code, Section XI (ASME
BPV XI) Code Case N-921, ``Alternative 12-yr Inspection Interval
Duration, Section XI, Division 1,'' to be conditionally acceptable.
This code case allows NRC licensees to implement an inservice
inspection (ISI) program based upon a 12-year ISI interval, as opposed
to the traditional 10-year ISI interval required by ASME BPV XI,
Article IWA- 2431. RG 1.147, Revision 21, specifies four conditions on
Code Case N-921.
Condition 2 states, ``This code case can only be implemented at the
beginning of an ISI interval as part of a routine update of the ISI
program.'' The July 17, 2024, final rule also added 10 CFR 50.55a(y),
which includes a definition for the term ``inservice inspection
interval.'' This definition, in part, specifies that the length of the
ISI interval is described in ASME BPV XI, Article IWA-2431.
II. Action.
By application dated April 27, 2026 (ML26117A373), the licensee,
pursuant to 10 CFR 50.12, ``Specific exemptions,'' requested exemptions
from certain requirements of 10 CFR 50.55a(a)(3)(ii) and 10 CFR
50.55a(y) to allow the use of Code Case N-921 after the start dates of
the first ISI interval at Vogtle, Units 3 and 4, which is not in
accordance with Condition 2 on Code Case N-921, as specified in RG
1.147, Revision 21. The first ISI interval at Vogtle, Units 3 and 4,
began on July 31, 2023, and April 29, 2024, respectively. The end of
the current 10-year first ISI interval is July 30, 2033, and April 28,
2034, for Vogtle, Units 3 and 4, respectively. The end of the proposed
12-year first ISI interval is July 30, 2035, and April 28, 2036, for
Vogtle, Units 3 and 4, respectively. The licensee stated that the ASME
Section XI Code of Record for the Vogtle, Units 3 and 4, first ISI
Interval is the 2019 Edition. The licensee stated that the Vogtle,
Units 3 and 4, augmented inspection examination schedules will remain
unchanged. The licensee also stated that the exceptions of IWB-2411(a),
IWC-2411(a) and IWD-2411(a) will be applied to Table 1 of Code Case N-
921 when implemented.
III. Discussion.
Pursuant to 10 CFR 50.12(a), the Commission may, upon application
by any interested person or upon its own initiative, grant exemptions
from the requirements of 10 CFR part 50 when (1) the exemptions are
authorized by law, will not present an undue risk to the public health
and safety, and are consistent with the common defense and security and
(2) special circumstances are present. Under 10 CFR 50.12(a)(2),
special circumstances
[[Page 75887]]
are present when at least one of the following six conditions are met:
(i) Application of the regulation in the particular circumstances
conflicts with other rules or requirements of the Commission; or
(ii) Application of the regulation in the particular circumstances
would not serve the underlying purpose of the rule or is not necessary
to achieve the underlying purpose of the rule; or
(iii) Compliance would result in undue hardship or other costs that
are significantly in excess of those contemplated when the regulation
was adopted, or that are significantly in excess of those incurred by
others similarly situated; or
(iv) The exemption would result in benefit to the public health and
safety that compensates for any decrease in safety that may result from
the grant of the exemption; or
(v) The exemption would provide only temporary relief from the
applicable regulation and the licensee or applicant has made good faith
efforts to comply with the regulation; or
(vi) There is present any other material circumstance not
considered when the regulation was adopted for which it would be in the
public interest to grant an exemption.
A. The Exemptions are Authorized by Law
The exemptions would authorize exemption from certain requirements
of 10 CFR 50.55a(a)(3)(ii) and 10 CFR 50.55a(y) to allow the use of
Code Case N-921, after the start dates of the first ISI interval at
Vogtle, Units 3 and 4. As stated, 10 CFR 50.12(a) allows the NRC to
grant an exemption from the requirements of 10 CFR part 50, including
10 CFR 50.55a(a)(3)(ii) and 10 CFR 50.55a(y), when the exemption is
authorized by law. Exemption is authorized by law where it is not
expressly prohibited by statute or regulation. Proposed exemptions are
implicitly authorized by law if it will not present an undue risk to
public health and safety, is consistent with the common defense and
security, and special circumstances are present, and no other
provisions in law prohibit, or otherwise restrict, its application. The
NRC staff has determined that no provisions in law expressly prohibit
or otherwise restrict the application of the requested exemptions. The
NRC staff has also determined, as explained below, that the requested
exemptions will not present an undue risk to public health and safety,
is consistent with the common defense and security, and special
circumstances are present. Therefore, the NRC staff concludes that the
exemptions are authorized by law.
B. The Exemptions Present No Undue Risk to Public Health and Safety
These exemptions would allow the licensee to implement Code Case N-
921 after the start dates of the first ISI interval at Vogtle, Units 3
and 4. The first interval for Vogtle, Unit 3, began July 31, 2023 and
on April 29, 2024 for Vogle, Unit 4. The action does not change the
manner in which the plant operates and maintains public health and
safety because the exemptions do not result in a change to the facility
or the current operating license. The licensee stated that extending
the ISI interval by two years does not impact the technical basis
supporting any of the currently authorized 10 CFR 50.55a alternatives
and does not create any particular challenge in reconciling the ISI
inspection schedules to conform with the three four-year periods
specified in Code Case N-921. Accordingly, the NRC staff reviewed the
alternatives listed in Attachment 2 of the licensee's exemption request
dated April 27, 2026, for ISI interval-related impacts and identified
several common themes in these alternatives and evaluated the
alternatives as described below.
The NRC noted that the following previously authorized
alternatives/relief requests were based on a 10-year ISI interval for
which SNC performed a review, as described in the letter dated April
27, 2026, and assessed the impact of extending the interval by 2 years
to implement Code Case N-921 on the technical basis supporting each
alternative.
VEGP 3&4--PSI/ISI-ALT-06--April 25, 2019 (ML19087A173)
VEGP 3&4--PSI/ISI-ALT-08--March 26, 2018 (ML18071A359)
VEGP 3&4--PSI/ISI-ALT-14R1--September 17, 2020
(ML20147A663)
VEGP 3&4--PSI-ISI-ALT-15R1--April 9, 2021 (ML21090A247)
VEGP 3&4--ISI-ALT-17--April 14, 2023 (Package,
ML23095A284)
VEGP 3&4--ISI1-ALT-18--May 4, 2023 (Package, ML23109A067)
VEGP 3&4--ISI-ALT-2025-01--July 24, 2025 (ML25196A297)
Alternatives With No ISI Interval Relationship
NRC staff noted that the results of SNC's assessment determined
that there is no impact on the technical basis supporting any of the
previously approved alternatives. For example, the previously approved
alternatives approved include: inspection of the pipe base material and
weld from the pipe side in lieu of a volumetric inspection; use of
alternative counterbore configurations on weld joints; alternative flaw
acceptance criteria; reduced coverage due to inaccessibility; visual
inspection in lieu of volumetric sections for inner radius sections of
specific reactor vessel nozzles; and utilization of a later edition of
the ASME Code, Section XI. Therefore, the NRC staff's basis for
approving the previously approved alternatives listed above are not
impacted by extending the length of the ISI interval to 12 years.
Based on its review of the licensee's analysis of alternatives in
Enclosure 2 of the exemption request, dated April 27, 2026, the NRC
staff concludes that the exemptions would not result in any significant
reduction in the effectiveness of the ISI programs implemented by the
licensee at Vogtle, Units 3 and 4. Further, based on the above, the NRC
staff concludes that the exemptions would not present an undue risk to
the public health and safety.
C. The Exemptions are Consistent With the Common Defense and Security
The requested exemptions would allow the licensee to implement Code
Case N-921 after the start dates of the first ISI interval at Vogtle,
Units 3 and 4. The change is administrative in nature, adequately
controlled by the ISI Program criteria and ASME Code requirements and
is not related to security issues. The length of the ISI interval is
also not related to security issues. Thus, NRC staff determined that
the common defense and security is not impacted by this exemption, and,
therefore, the exemptions are consistent with the common defense and
security.
D. Special Circumstances
The regulation under 10 CFR 50.12(a)(2) states, in part, that
``[t]he Commission will not consider granting an exemption unless
special circumstances are present,'' and describes, in 10 CFR
50.12(a)(2)(i)--(vi), the conditions under which special circumstances
exist.
In the licensee's exemption request submittal dated April 27, 2026,
the licensee stated that three of the six special circumstances listed
in 10 CFR 50.12(a)(2) are present:
(ii) Application of the regulation in the particular circumstances
would not serve the underlying purpose of the rule or is not necessary
to achieve the underlying purpose of the rule.
(iii) Compliance would result in undue hardship or other costs that
are significantly in excess of those contemplated when the regulation
was
[[Page 75888]]
adopted, or that are significantly in excess of those incurred by
others similarly situated.
(vi) There is present any other material circumstance not
considered when the regulation was adopted for which it would be in the
public interest to grant an exemption.
The NRC staff performed an independent review of the special
circumstances claimed by the licensee.
For the special circumstances in 10 CFR 50.12(a)(2)(ii), the
licensee stated that the purpose of the July 2024 final rule (89 FR
58039) was to identify ASME Code cases that the NRC determined to be
acceptable for use. The licensee noted that NRC's approval of Code Case
N-921 includes a condition that, ``This code case can only be
implemented at the beginning of an ISI interval as part of a routine
update of the ISI program.'' The licensee provided the following
support to the claim that application of the regulation would not serve
the underlying purpose of the rule:
The licensee stated: ``Implementation of Code Case N-921
during the current ISI interval (and the first of three periods within
the interval) does not inhibit the ability to comply with code required
periodic distribution requirements and allows for a more consistent
periodic distribution of examinations and tests throughout the extended
interval.''
Tables 2 and 3 for Vogtle, Units 3 and 4, of the
licensee's submittal dated April 27, 2026, described the new inspection
period dates and corresponding refueling outages.
The licensee evaluated all NRC-authorized alternative
requests in the enclosure of the licensee's submittal, dated April 27,
2026, consistent with NRC concerns expressed in the 89 FR 58039 final
rule preamble (see NRC staff's independent review above).
The licensee stated that the site ISI program owners
routinely modify the ISI examination schedule during the ISI interval
due to various reasons, such as evolving availability of qualified
personnel and equipment.
In the 89 FR 58039 final rule preamble, the NRC communicated that
order and predictability of licensee ISI programs is a paramount
consideration. The careful advance planning required by ASME BPV XI and
10 CFR 50.55a maximizes licensee effectiveness in successfully
executing all ISI requirements. The successful execution of ISI
requirements, in turn, contributes to nuclear safety by providing a
data stream used to continuously evaluate the structural integrity of
safety-related components. The NRC staff determined that the licensee
provided adequate evidence that, if the NRC staff approves the proposed
exemptions, the ISI programs at Vogtle, Units 3 and 4, will be managed
in a manner that promotes order and predictability.
In the 89 FR 58039 final rule, the NRC added a new condition
requiring that Code Case N-921 be implemented at the start of a new ISI
interval. The basis for the condition is that implementation of Code
Case N-921 in the middle of an ISI interval creates complications
related to existing examination schedules and alternatives that were
approved assuming a 10-year ISI interval. As discussed above, the
licensee demonstrated that no currently approved alternatives are
impacted by extending the length of the ISI interval to 12 years.
Another concern identified by the NRC staff with allowing mid-cycle
implementation of Code Case N-921 involves potential complications of
reconciling ISI inspection schedules to conform with the three four-
year periods specified in Code Case N-921. As discussed above, the
licensee stated that in anticipation of implementing Code Case N-921,
it proactively adjusted examination schedules accordingly to maintain
compliance with Code Case N-921 periodic distribution requirements.
Therefore, the NRC staff concludes that application of the regulation
would not serve the underlying purpose of the rule because the licensee
demonstrated that mid-cycle implementation of Code Case N-921 will have
no impact on the ISI programs at Vogtle, Units 3 and 4. Based on the
above, the NRC staff determined that the special circumstances
described in 10 CFR 50.12(a)(2)(ii) are present for the requested
exemption. Since the regulations require that one of the special
circumstances in 10 CFR 50.12(a)(2) be satisfied before NRC may grant
an exemption, the NRC staff did not evaluate the licensee's additional
claims that the special circumstances in 10 CFR 50.12(a)(2)(iii) and
(vi) are also applicable.
E. Environmental Considerations
The NRC staff determined that the exemptions discussed herein meets
the eligibility criteria for categorical exclusion set forth in 10 CFR
51.22(d)(1) due to changes to requirements in 10 CFR part 50 or 52 with
respect to changes to inspection or surveillance requirements, because
the changes do not provide any ground disturbance and there is no
significant change in the types or significant increase in the amounts
of any effluents that may be released offsite, no significant increase
in individual or cumulative public or occupational radiation exposure,
and no significant increase in the potential for or consequences from
radiological accidents. Therefore, in accordance with 10 CFR 51.22(d),
no environmental impact statement or environmental assessment need to
be prepared in connection with the issuance of these exemptions.
The basis for this NRC staff determination is discussed as follows
with an evaluation against each of the requirements in 10 CFR 51.22(d).
There is no significant hazards consideration.
The criteria for determining whether an action involves a
significant hazards consideration are found in 10 CFR 50.92(c). The
exemptions only involve an ISI program implementation change, which is
administrative in nature. The exemptions do not adversely affect plant
equipment, operation, or procedures. Therefore, there are no
significant hazard considerations, because granting the exemptions
would not: (1) involve a significant increase in the probability or
consequences of an accident previously evaluated; or (2) create the
possibility of a new or different kind of accident from any accident
previously evaluated; or (3) involve a significant reduction in a
margin of safety.
There is no significant change in the types or significant increase
in the amounts of any effluents that may be released offsite.
The exemptions involve only an ISI program implementation change,
which is administrative in nature, and does not involve any changes in
the types or significant increase in the amounts of any effluents that
may be released offsite.
There is no significant increase in individual or cumulative public
or occupational radiation exposure.
Since the exemptions involve only an ISI program implementation
change, which is administrative in nature, it does not contribute to
any significant increase in occupational or public radiation exposure.
There is no significant construction impact.
Since the exemptions involve only an ISI program implementation
change, which is administrative in nature, it does not involve any
construction impact.
There is no significant increase in the potential for or
consequences from radiological accidents.
The exemptions involve only an ISI program implementation change,
which is administrative in nature and does not impact the potential for
or consequences from accidents.
[[Page 75889]]
The requirements from which the exemption is sought involve
requirements that are of an administrative, managerial, or
organizational nature.
The exemptions involve only an ISI program implementation change
regarding examination scheduling requirements and other requirements of
an administrative, managerial, or organizational nature, because it is
associated with the marginal extension from a 10-year to 12-year ISI
interval.
Based on the above, NRC staff determined that the exemptions meet
the eligibility criteria for the categorical exclusion set forth in 10
CFR 51.22(d)(1). Therefore, in accordance with 10 CFR 51.22(d), no
environmental impact statement or environmental assessment need to be
prepared in connection with these exemptions requests.
IV. Conclusions
Accordingly, the Commission has determined that, pursuant to 10 CFR
50.12, the exemptions are authorized by law, will not present an undue
risk to the public health and safety, and are consistent with the
common defense and security. Also, special circumstances are present.
Therefore, the Commission hereby grants SNC's request for exemptions
from certain requirements of 10 CFR 50.55a(a)(3)(ii) and 10 CFR
50.55a(y) to allow the implementation of ASME Code Case N-921 after the
start date of the first ISI interval at Vogtle, Units 3 and 4.
The exemptions are effective upon issuance.
Dated: November 17, 2026
For the Nuclear Regulatory Commission.
/RA/
Mahmoud Jardaneh,
Director, Division of Licensing Projects I, Office of Nuclear
Reactor Regulation.
[FR Doc. 2026-23887 Filed 11-23-26; 8:45 am]