[Federal Register Volume 91, Number 227 (Friday, November 27, 2026)]
[Notices]
[Pages 76863-76864]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2026-24165]

-----------------------------------------------------------------------

SURFACE TRANSPORTATION BOARD

[Docket No. FD 36447]

Lake Providence Port Commission--Feeder Line Application--Line of
Delta Southern Railroad Located in East Carroll and Madison Parishes,
LA

This proceeding involves efforts by the Lake Providence Port
Commission (LPPC), a noncarrier political subdivision of the State of
Louisiana, to acquire the portion of the McGehee-Tallulah rail corridor
owned by Delta Southern Railroad, Inc. (DSRR), a Class III rail
carrier, through a feeder line application under 49 U.S.C. 10907 and 49
CFR part 1151.\1\ LPPC owns two other segments of the corridor (one,
jointly with North Louisiana & Arkansas Railroad, Inc. (NLA)), and
Southeast Arkansas Economic Development District owns a third segment.
NLA holds operating authority over these three segments and has been
designated by LPPC as the proposed operator of DSRR's segment if the
feeder line application is granted. (See, e.g., Am. Appl. 1, 19-20, 56,
58-59, Jan. 4, 2023.)
---------------------------------------------------------------------------

\1\ The McGehee-Tallulah rail corridor extends from milepost
408.9 in McGehee, Ark., where it connects with Union Pacific
Railroad Company, south to milepost 498.44 in Tallulah, La., where
it connects with Canadian Pacific Kansas City Limited (CPKC). DSRR
owns and operates the southernmost segment of the corridor, from
milepost 471.0 at Lake Providence, La., south to the connection with
CPKC at milepost 498.44 in Tallulah (hereinafter, the Line).
---------------------------------------------------------------------------

This decision provides notice of LPPC's amended feeder line
application and adopts a procedural schedule for the submission of
competing applications, comments and verified responses, and verified
replies.

Background 2
---------------------------------------------------------------------------

\2\ A more detailed description of the procedural history and
background of this proceeding is provided in the Board's decision
served on September 25, 2025. See Lake Providence Port Comm'n--
Feeder Line Appl.--Line of Delta S. R.R. Located in E. Carroll &
Madison Pars., La. (Sep. 2025 Decision), FD 36447, slip op. at 2-6
(STB served Sep. 25, 2025).
---------------------------------------------------------------------------

LPPC's initial feeder line application, which sought to acquire
only part of the Line, was accepted and a procedural schedule
established in early 2021. See Lake Providence Port Comm'n--Feeder Line
Appl.--Line of Delta S. R.R. Located in E. Carroll & Madison Pars.,
La., FD 36447 (STB served Jan. 15, 2021). On August 23, 2022, the Board
granted LPPC's request to file an amended application, see Lake
Providence Port Comm'n--Feeder Line Appl.--Line of Delta S. R.R.
Located in E. Carroll & Madison Pars., La., FD 36447 (STB served Aug.
23, 2022), which LPPC filed on January 4, 2023, seeking to acquire the
entire Line. Following an unsuccessful challenge by DSRR to the
completeness of the amended application and LPPC's satisfaction of
certain technical requirements, see Lake Providence Port Comm'n--Feeder
Line Appl.--Line of Delta S. R.R. Located in E. Carroll & Madison
Pars., La. (Nov. 2023 Decision), FD 36447, slip op. at 6-13 (STB served
Nov. 20, 2023), LPPC's amended application was conditionally accepted,
and LPPC was permitted to proceed with valuation discovery under the
process specified in the November 2023 Decision. See Lake Providence
Port Comm'n--Feeder Line Appl.--Line of Delta S. R.R. Located in E.
Carroll & Madison Pars., La. (Dec. 2023 Decision), FD 36447, slip op.
at 2 (STB served Dec. 11, 2023). In accordance with that process, LPPC
notified the Board that it completed that valuation discovery on May
29, 2024, and submitted supplemental evidence regarding valuation of
the Line, based on data provided by DSRR in response to LPPC's
discovery requests, in July 2024.
Shortly thereafter, the Board placed this proceeding in abeyance
pending resolution of state court litigation relating to LPPC's
authority under Louisiana law to pursue the feeder line application.
See Lake Providence Port Comm'n--Feeder Line Appl.--Line of Delta S.
R.R. Located in E. Carroll & Madison Pars., La. August 2024 Decision),
FD 36447 (STB served Aug. 2, 2024). In a decision served September 25,
2025, the Board, among other things, removed the proceeding from
abeyance, noting that the question surrounding LPPC's authority had
been resolved by the passage of new state legislation, and directed the
parties to confer and submit a proposed procedural schedule by October
9, 2025. See Sep. 2025 Decision, FD 36447, slip op. at 6-8.
Thereafter, the parties submitted competing proposals for a
procedural schedule, and DSRR filed a motion to strike or compel
related to four of LPPC's shipper witnesses, to which LPPC and the
shipper witnesses each filed a reply in opposition. In light of these
unresolved issues and ongoing disputes, by decision served December 12,
2025, the Board assigned an administrative law judge (ALJ) to handle
all remaining discovery matters. See Lake Providence Port Comm'n--
Feeder Line Appl.--Line of Delta S. R.R. Located in E. Carroll &
Madison Pars., La. (Dec. 2025 Decision), FD 36447, slip op. at 3 (STB
served Dec. 12, 2025). Between December 31, 2025, and July 2, 2026, the
ALJ issued several decisions addressing discovery disputes.
By decision served May 27, 2026, the Board directed LPPC to file by
June 16, 2026, any revisions to its valuation calculations and
supporting evidence that LPPC believed were warranted based on the
updated information DSRR provided in discovery. See Lake Providence
Port Comm'n--Feeder Line Appl.--Line of Delta S. R.R. Located in E.
Carroll & Madison (May 2026 Decision), FD 36447, slip op. at 2-3 (STB
served May 27, 2026). The May 2026 Decision also set a deadline of July
6, 2026, for the close of discovery and stated that notice of the
amended feeder line application would thereafter be published in the
Federal Register and a procedural schedule set. Id. at 3. On June 16,
2026, LPPC filed and served various revisions to its valuation
calculations and supporting evidence.
On July 2, 2026, the ALJ denied a DSRR motion to compel NLA to
respond to certain discovery. See Lake Providence Port Comm'n--Feeder
Line Appl.--Line of Delta S. R.R. Located in E. Carroll & Madison
Pars., La. (July 2026 Decision), FD 36447 (STB served July 2, 2026). On
September 2, 2026, the Board denied DSRR's appeal of two aspects of the
ALJ's July 2026 Decision. See Lake Providence Port Comm'n--Feeder Line
Appl.--Line of Delta S. R.R. Located in E. Carroll & Madison Pars., La.
(Sep. 2026 Decision), FD 36447, slip op. at 3-6 (STB served Sep. 2,
2026).

[[Page 76864]]

The Board also authorized DSRR to reopen two depositions for the
limited purpose of examination pertaining to an unwritten modification
agreement between LPPC and NLA. See id. at 7-8. By letter dated
September 30, 2026, DSRR informed the Board that it had conducted the
reopened depositions. (See DSRR Letter, Sep. 30, 2026.) \3\
---------------------------------------------------------------------------

\3\ LPPC also filed a letter on September 30 noting that the
reopened depositions had concluded and requesting that the Board
``promptly issue a procedural schedule.'' (LPCC Letter, Sep. 30,
2026.) On October 13, 2026, LPPC informed the Board, among other
things, that corrected transcripts for the reopened depositions had
been served on DSRR's counsel but stated it is not necessary to
delay issuance of the procedural schedule to allow time for DSRR to
provide those transcripts to the Board. (LPPC Letter, Oct. 13,
2026.) DSRR filed the corrected transcripts with the Board on
October 22, 2026.
---------------------------------------------------------------------------

On October 30, 2026, DSRR filed a motion requesting that the Board
issue a procedural schedule, along with a proposed schedule for
filings. (See DSRR Mot. for Procedural Schedule, Oct. 30, 2026.) LPPC
replied to the motion on November 2, 2026. (See LPPC Reply, Nov. 2,
2026.)

Discussion and Conclusions

As explained in the December 2023 Decision, the Board's acceptance
of the amended application was conditional to permit LPPC to seek
discovery of DSRR and to file revised valuation calculations and
supporting evidence. Dec. 2023 Decision, FD 36447, slip op. at 2.
Discovery has been completed, and LPPC has filed its updated valuation
calculations and supporting evidence. Accordingly, notice of LPPC's
amended application will be published in the Federal Register.

Procedural Schedule

The September 2025 Decision directed the parties to confer and
submit (jointly, if possible) a proposed procedural schedule that took
into account a reasonable period of time for DSRR to complete discovery
and the general timeline for record-building contemplated by the
Board's regulations at 49 CFR 1151.2(c), (e), and (f). Sep. 2025
Decision, FD 36447, slip op. at 8. The parties submitted separate
proposals on November 19, 2025.\4\ (See DSRR Mot. for Procedural
Schedule, Nov. 19, 2025; LPPC Response, Nov. 19, 2025.)
---------------------------------------------------------------------------

\4\ Because of a lapse in the Board's appropriation, the initial
October 9, 2025 deadline for proposals was extended to November 20,
2025. See Materials Due to Be Submitted During the Fed. Gov't
Shutdown, EP 751, slip op. at 1 (STB served Nov. 13, 2025).
---------------------------------------------------------------------------

DSRR included a new proposed procedural schedule with its October
30, 2026 motion. DSRR proposes 30 days--the time period specified by 49
CFR 1151.2(c)--for the filing of competing applications. (DSRR Mot. for
Procedural Schedule 3, Oct. 30, 2026.) DSRR proposes that verified
statements and comments addressing both the amended application and any
competing applications be due 60 days thereafter--more than the 30 days
contemplated in 49 CFR 1151.2(e). (DSRR Mot. for Procedural Schedule 3,
Oct. 30, 2026.) DSRR states it ``expects its filing to be extensive and
robust given the substantial record.'' (Id.) DSRR also argues the
record will show LPPC has failed the public convenience and necessity
(PC&N) test \5\ so substantially that the Board could benefit from
bifurcating the PC&N analysis from consideration of the constitutional
minimum value (CMV) of the Line.\6\ Finally, DSRR proposes 20 days for
the filing of verified replies to responses to the amended application
and any competing applications. (DSRR Mot. for Procedural Schedule 3,
Oct. 30, 2026.)
---------------------------------------------------------------------------

\5\ Under 49 U.S.C. 10907, a financially responsible party may
obtain a Board order requiring the sale of a rail line in two
situations, only one of which is applicable here: when the PC&N
require or permit the sale. 49 U.S.C. 10907(b)(1).
\6\ To be an eligible purchaser under the feeder line program,
an applicant must show it is financially responsible. 49 U.S.C.
10907(b)(1)(B). To be considered financially responsible, the
purchaser must be able to (1) pay the CMV for the line and (2) cover
the expenses of operating on the line for at least the first three
years. Id. 10907(a).
---------------------------------------------------------------------------

In reply, LPPC states that it supports issuance of a procedural
schedule and responds to various assertions in DSRR's motion. (See LPPC
Reply, Nov. 2, 2026.) LPPC generally does not oppose the schedule DSRR
proposes; however, LPPC requests 30 days (rather than 20) to file its
verified reply, given the anticipated length of DSRR's response to the
amended application. (Id. at 3-4.) LPPC objects to DSRR's suggestion
that the Board consider only whether LPPC has satisfied the PC&N test
and delay determining the CMV of the Line. (Id. at 2-3.)
DSRR's proposed schedule, modified to permit 30 days for the filing
of verified replies, is reasonable and will be adopted. However, to
avoid unnecessary delay, DSRR's request to bifurcate will be denied.
Accordingly, all filings should address the PC&N standard, the CMV of
the Line, and financial responsibility.
For the reasons discussed, DSRR's October 30, 2026 motion for
issuance of a procedural schedule will be granted in part, and the
following procedural schedule will be adopted for this proceeding:
Competing applications by other parties seeking to acquire
all or any portion of the Line are due by December 28, 2026.
Verified statements and comments addressing the amended
application and competing applications must be filed by February 25,
2027.
Verified replies by applicants and other interested
parties must be filed by March 29, 2027.
It is ordered:
1. Notice of LPPC's amended feeder line application will be
published in the Federal Register.
2. DSRR's October 30, 2026 motion for issuance of a procedural
schedule is granted in part, as explained above.
3. The schedule set forth above will govern this proceeding.
4. This decision is effective on its service date.

Decided: November 24, 2026.

By the Board, Anika S. Cooper, Chief Counsel, Office of Chief
Counsel.
Tammy Lowery,
Clearance Clerk.
[FR Doc. 2026-24165 Filed 11-25-26; 8:45 am]