미디어 커버리지1건1개 미디어
general
중도 성향

Timure dry port project remains stalled a year after Lhende flood

Khabarhub - News
Timure dry port project remains stalled a year after Lhende flood

RASUWA: A year after the devastating flood in the Lhende Khola disrupted operations at the Timure customs point for six months, trade through the Nepal-China border has largely returned to normal.

However, construction of the Chinese-funded dry port at Timure remains at a standstill.

The dry port project, backed by an investment of Rs 2.16 […] ...

전문 보기

이 뉴스, 어떠셨어요?

탭 한 번으로 반응 · 로그인 불필요

관련 뉴스

관련 뉴스 제보는 로그인 후 가능합니다.